Skip to content
Department of Energy

Remanufacture of 8618 80 KW High Power Triode

Solicitation: 473220
Notice ID: 79703a0757c248819395a6dc0a3e6eb1
TypeCombined Synopsis SolicitationNAICS 334419PSC5999DepartmentDepartment of EnergyStateNYPostedMar 25, 2026, 12:00 AM UTCDueApr 11, 2026, 03:59 AM UTCCloses in 4 days

Combined Synopsis Solicitation from ENERGY, DEPARTMENT OF • ENERGY, DEPARTMENT OF. Place of performance: NY. Response deadline: Apr 11, 2026. Industry: NAICS 334419 • PSC 5999.

Market snapshot

Awarded-market signal for NAICS 334419 (last 12 months), benchmarked to sector 33.

12-month awarded value
$102,367,854
Sector total $48,626,233,876 • Share 0.2%
Live
Median
$350,000
P10–P90
$34,470$351,089
Volatility
Volatile90%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.2%
share
Momentum (last 3 vs prior 3 buckets)
+50%($20,377,358)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for NY
Live POP
Place of performance
Upton, New York • United States
State: NY
Contracting office
Upton, NY • 11973 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NY20260007 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026New York • Dutchess, Orange, Sullivan +1
Rate
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials whether they contain asbestos or not from mechanical systems
Base $41.74Fringe $27.58
Rate
Insulator/asbestos worker (includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)
Base $41.74Fringe $27.58
+109 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 109 more rate previews.
Davis-BaconBest fitstate match
NY20260007 (Rev 1)
Open WD
Published Jan 30, 2026New York • Dutchess, Orange, Sullivan +1
Rate
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials whether they contain asbestos or not from mechanical systems
Base $41.74Fringe $27.58
Rate
Insulator/asbestos worker (includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)
Base $41.74Fringe $27.58
Rate
HANDLER Duties limited to preparation, wetting, stripping, removal scrapping, vacuuming, bagging and disposing of all insulation materials; whether they contain asbestos or not from mechancial systems
Base $46.62Fringe $49.30
+108 more occupation rates in this WD
Davis-Baconstate match
NY20260002 (Rev 1)
Open WD
Published Jan 30, 2026New York • Albany, Columbia, Fulton +7
Rate
Asbestos/Insulator Worker SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems
Base $41.74Fringe $27.58
Rate
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems
Base $41.74Fringe $27.58
Rate
BOILERMAKER
Base $43.34Fringe $27.66
+90 more occupation rates in this WD
Davis-Baconstate match
NY20260004 (Rev 1)
Open WD
Published Jan 30, 2026New York • Broome, Chenango
Rate
coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement
Base $43.25Fringe $27.29
Rate
F WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system
Base $38.50Fringe $25.04
Rate
BOILERMAKER
Base $43.34Fringe $27.66
+56 more occupation rates in this WD
Davis-Baconstate match
NY20260031 (Rev 1)
Open WD
Published Jan 30, 2026New York • Herkimer
Rate
coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement
Base $43.25Fringe $27.29
Rate
F WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system
Base $38.50Fringe $25.04
Rate
BOILERMAKER
Base $43.34Fringe $27.66
+49 more occupation rates in this WD

Point of Contact

Name
Blake Clemmer
Email
bclemmer@bnl.gov
Phone
6313442762
Name
Maile Nichols
Email
mnichols@bnl.gov
Phone
6313443936

Agency & Office

Department
ENERGY, DEPARTMENT OF
Agency
ENERGY, DEPARTMENT OF
Subagency
BROOKHAVEN NATL LAB -DOE CONTRACTOR
Office
Not available
Contracting Office Address
Upton, NY
11973 USA

More in NAICS 334419

Description

BNL seeks a qualified vendor to reproduce the 8618, 80 KW High Power Triode tube, including all necessary non-recurring engineering (NRE). In the absence of original schematics, the vendor shall develop sufficient drawings and technical documentation to fabricate the tube to remanufactured specifications and provide a complete drawing package upon completion. The vendor will also produce all required manufacturing fixtures, tooling, and build instructions, and all tubes shall be manufactured using new materials and subassemblies to ensure long-term reliability.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.