Davis-Bacon
NY20260002 (Rev 1)
Coverage: New York • Albany, Columbia, Fulton +7.
Published: Jan 30, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| Asbestos/Insulator Worker SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems | $41.74 | $27.58 |
| HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems | $41.74 | $27.58 |
| BOILERMAKER | $43.34 | $27.66 |
| BRICKLAYER BRICKLAYERS, STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CAULKERS & CLEANERS | $41.79 | $22.33 |
| HEAVY & HIGHWAY CONSTRUCTION CEMENT MASONS | $43.01 | $21.31 |
| MARBLE, TILE & TERRAZZO FINISHERS | $29.62 | $18.00 |
| MARBLE, TILE & TERRAZZO WORKERS | $38.01 | $20.58 |
| Carpenters: HEAVY AND HIGHWAY CONSTRUCTION (COLUMBIA AND GREENE COUNTIES) Carpenters, Millwrights, Pile Drivers | $44.72 | $31.23 |
| Carpenters: SARATOGA COUNTY BUILDING | $36.38 | $24.65 |
| WASHINGTON COUNTY BUILDING | $36.38 | $24.65 |
| Carpenters: BUILDING CONSTRUCTION (Excluding Montgomery County) Carpenters & Soft Floor Layers | $36.38 | $24.65 |
| Piledriver | $31.68 | $20.60 |
| HEAVY & HIGHWAY CONSTRUCTION Carpenters | $44.28 | $24.50 |
| Carpenters: CARPENTERS | $44.28 | $24.50 |
| DIVER TENDERS | $34.02 | $21.10 |
| DIVERS (Dry Day) | $45.28 | $24.50 |
| DIVERS | $69.28 | $24.50 |
| PILEDRIVERS | $33.02 | $21.10 |
| ELECTRICIAN | $48.00 | $32.09 |
| Elevator Constructor | $57.73 | $38.43 |
| ELEVATOR MECHANIC | $76.12 | $38.98 |
| POWER EQUIPMENT OPERATOR GROUP A(1) | $55.42 | $33.20 |
| GROUP A | $54.93 | $33.20 |
| GROUP B | $53.91 | $33.20 |
| GROUP C | $51.01 | $33.20 |
| Power equipment operators: GROUP 1 | $57.30 | $33.55 |
| GROUP 2 | $56.39 | $33.55 |
| GROUP 3 | $53.82 | $33.55 |
| GROUP 4 | $63.30 | $33.55 |
| GROUP 5 | $61.80 | $33.55 |
| GROUP 6 | $60.30 | $33.55 |
| GROUP 7 | $58.91 | $33.55 |
| Ironworkers: Sheeter, Bucker-up | $38.75 | $25.48 |
| Sheeter | $38.75 | $25.48 |
| Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone Derrickmen | $38.50 | $25.48 |
| IRONWORKER Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman | $35.50 | $31.39 |
| Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont, and the City of Hudson) (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work) HEAVY & HIGHWAY GROUP 1 | $38.90 | $27.15 |
| a GROUP 2 | $43.15 | $27.15 |
| a GREENE COUNTY (Township of Catskill) HEAVY & HIGHWAY: GROUP 1 | $34.15 | $27.15 |
| a GROUP 2 | $38.90 | $27.15 |
| a GROUP 3 | $43.15 | $27.15 |
| a GROUP 4 | $48.00 | $27.15 |
| a TUNNEL, SHAFT & CAISSON WORK GROUP 1 | $48.05 | $29.50 |
| Laborers Building Construction Asbestos Removal | $24.00 | $20.64 |
| a Blasters, Form Setters, MotorBuggy Operator (Rider Type) | $23.00 | $20.64 |
| val Hazardous waste removal includes wetting, stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems | $24.00 | $20.64 |
| a HEAVY & HIGHWAY: GROUP 1 | $28.05 | $23.74 |
| a GROUP 2 | $28.25 | $23.74 |
| a GROUP 3 | $28.45 | $23.74 |
| a GROUP 4 | $28.65 | $23.74 |
| a Laborers | $22.50 | $20.64 |
| a Pipelayers, Motor Mixers, Motor Buggy Operator (Walk Behind) Power Lift (Walk Behind) | $22.65 | $20.64 |
| a Wagon Drill Operator | $22.90 | $20.64 |
| LABORER BUILDING: GROUP 1 | $28.74 | $20.14 |
| a GROUP 2 | $30.09 | $20.14 |
| a HEAVY & HIGHWAY: GROUP 1 | $39.19 | $26.75 |
| GROUP 2 | $39.39 | $26.75 |
| GROUP 3 | $39.59 | $26.75 |
| GROUP 4 | $39.79 | $26.75 |
| GROUP 5 | $41.69 | $26.75 |
| Laborers: BUILDING: GROUP 1 | $36.16 | $26.68 |
| GROUP 2 | $37.51 | $26.68 |
| Laborers: HEAVY & HIGHWAY: GROUP 1 | $41.69 | $27.65 |
| GROUP 2 | $41.89 | $27.65 |
| GROUP 3 | $42.09 | $27.65 |
| GROUP 4 | $42.29 | $27.65 |
| GROUP 5 | $44.19 | $27.65 |
| Laborers: HEAVY & HIGHWAY GROUP 1 | $36.45 | $27.80 |
| a GROUP 2 | $42.80 | $27.80 |
| a GROUP 3 | $43.90 | $27.80 |
| GLAZIER | $37.25 | $33.54 |
| Painters: Drywall Finisher | $35.94 | $24.66 |
| Lead Abatement Work | $35.94 | $24.66 |
| Painter/Paperhanger | $35.94 | $24.66 |
| Spray Rate | $36.94 | $24.66 |
| Painters: Lead Abatement Workers, Structural Steel Zone 1 | $34.50 | $21.69 |
| Zone 2 | $34.50 | $21.69 |
| Painters, Drywall Finishers, Spray Zone 1 | $33.50 | $21.69 |
| Zone 2 | $33.50 | $21.69 |
| PLUMBER/PIPEFITTER | $55.26 | $29.12 |
| PLUMBER (Including Steamfitting) Northern Zone | $31.40 | $31.70 |
| PLUMBER/PIPEFITTER | $44.88 | $33.60 |
| ROOFER | $30.50 | $19.84 |
| ROOFER | $38.05 | $24.27 |
| SPRINKLER FITTER | $47.85 | $28.94 |
| Sheet metal worker | $33.73 | $33.04 |
| Truck drivers: HEAVY & HIGHWAY GROUP 1 | $41.23 | $31.42 |
| a GROUP 2 | $41.29 | $31.42 |
| a GROUP 3 | $41.38 | $31.42 |
| a GROUP 4 | $41.52 | $31.42 |
| a GROUP 5 | $41.69 | $31.42 |
| Truck drivers: GROUP 1 | $33.65 | $30.79 |
| a GROUP 2 | $33.95 | $30.79 |
Related Wage Determinations
View directory →Davis-Bacon
NY20260039 (Rev 1)
New York • Warren
Davis-Bacon
NY20260025 (Rev 1)
New York • Putnam
Davis-Bacon
NY20260008 (Rev 1)
New York • Cattaraugus, Chautauqua, Erie
Davis-Bacon
NY20260003 (Rev 1)
New York • Bronx, Kings, New York +2
Davis-Bacon
NY20260017 (Rev 1)
New York • Westchester
Davis-Bacon
NY20260007 (Rev 1)
New York • Dutchess, Orange, Sullivan +1