Skip to content
Davis-Bacon

NY20260007 (Rev 1)

Coverage: New York • Dutchess, Orange, Sullivan +1.

Published: Jan 30, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials whether they contain asbestos or not from mechanical systems$41.74$27.58
Insulator/asbestos worker (includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)$41.74$27.58
HANDLER Duties limited to preparation, wetting, stripping, removal scrapping, vacuuming, bagging and disposing of all insulation materials; whether they contain asbestos or not from mechancial systems$46.62$49.30
Insulator/asbestos worker (Includes application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)$46.62$49.30
BOILERMAKER$68.88$49.83
BRICKLAYER (BUILDING CONSTRUCTION) DUTCHESS, ORANGE (Excluding the town of Tuxedo) and ULSTER COUNTIES Bricklayers, Cement Masons, Plasterers, Stone Masons$46.45$37.50
ORANGE COUNTY (Town of Tuxedo) Bricklayers, Cement Masons, Plasterers, Stone Masons$47.44$38.00
BRICKLAYER (HEAVY CONSTRUCTION) DUTCHESS, ORANGE (Excluding the town of Tuxedo) and ULSTER COUNTIES Bricklayers, Cement Masons, Plasterers, Stone Masons$46.45$37.50
BRICKLAYER (HIGHWAY CONSTRUCTION) DUTCHESS, ORANGE (Excluding the town of Tuxedo), SULLIVAN and ULSTER COUNTIES Bricklayers, Cement Masons, Plasterers, Stone Masons$46.45$37.50
Carpenters: BUILDING CONSTRUCTION Carpenters, Millwrights, Pile Drivers$44.72$31.23
HEAVY & HIGHWAY CONSTRUCTION Carpenters, Millwrights, Pile Drivers$44.72$31.23
MILLWRIGHT$47.83$43.03
Diver Tender$55.00$55.84
Diver$75.46$55.84
Dock Builder & Piledrivermen$60.59$55.84
ELEVATOR MECHANIC$76.12$38.98
Power Equipment Operator GROUP 1A$59.04$31.32
a GROUP 1B$54.41$31.32
a GROUP 2A$56.97$31.32
a GROUP 3A$54.88$31.32
a GROUP 3B$52.25$31.32
a GROUP 4A$54.33$31.32
a GROUP 4B$45.94$31.32
a GROUP 5$49.53$31.32
a GROUP 5A$61.95$31.32
a GROUP 5B$47.00$31.32
a GROUP 6$49.26$31.32
Power Equipment Operator (HEAVY & HIGHWAY) GROUP 1$68.63$35.25
a GROUP 1-A$60.42$35.25
a GROUP 1-B$63.70$35.25
a GROUP 2-A$57.84$35.25
a GROUP 2-B$59.67$35.25
a GROUP 3$56.81$35.25
a GROUP 4-A$51.57$35.25
a GROUP 4-B$44.19$35.25
a GROUP 5$64.02$35.25
a GROUP 5-A-1$64.02$35.25
a GROUP 5-A-2$77.82$35.25
a GROUP 5-A-3$75.13$35.25
a GROUP 5-A-4$70.41$35.25
a GROUP 5-A-5$59.19$35.25
Power equipment operators: GROUP A(1)$55.42$33.20
GROUP A$54.93$33.20
GROUP B$53.91$33.20
GROUP C$51.01$33.20
Power Equipment Operator HEAVY & HIGHWAY GROUP 1$57.30$33.55
GROUP 2$56.39$33.55
GROUP 3$53.82$33.55
GROUP 4$63.30$33.55
GROUP 5$61.80$33.55
GROUP 6$60.30$33.55
GROUP 7$58.91$33.55
Power Equipment Operator BUILDING, HEAVY & HIGHWAY GROUP 1$61.72$37.50
GROUP 2$60.13$37.50
GROUP 3$58.22$37.50
GROUP 4$56.59$37.50
GROUP 5$61.72$37.50
GROUP 6$63.54$37.50
Power equipment operators: BUILDING CONSTRUCTION STEEL ERECTION GROUP 1$70.24$37.50
GROUP 2$68.58$37.50
GROUP 3$61.29$37.50
GROUP 4$58.63$37.50
GROUP 5$57.10$37.50
GROUP 6$53.34$37.50
GROUP 7$65.74$37.50
BUILDING CONSTRUCTION TANK ERECTION GROUP 1$69.96$37.50
GROUP 2$68.37$37.50
GROUP 3$64.85$37.50
GROUP 4$61.28$37.50
GROUP 5$54.07$37.50
OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1$62.35$37.50
GROUP 2$60.70$37.50
GROUP 3$58.56$37.50
GROUP 4$57.06$37.50
GROUP 5$53.34$37.50
GROUP 6$64.28$37.50
IRONWORKER$42.63$53.70
LABORER DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING CONSTRUCTION) GROUP 1$45.40$29.75
GROUP 2$46.20$29.75
DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (HEAVY & HIGHWAY:) GROUP 2$44.80$32.45
a GROUP 3$49.40$32.45
a ORANGE AND ULSTER COUNTIES (BUILDING CONSTRUCTION:) GROUP 1$35.95$27.15
GROUP 2$37.75$27.15
GROUP 3$40.50$27.15
ORANGE, ULSTER, AND SULLIVAN COUNTIES (HEAVY & HIGHWAY) GROUP 1$40.80$32.45
a GROUP 2$44.80$32.45
a GROUP 4$54.70$32.45
a TUNNEL, SHAFT & CAISSON WORK GROUP 1$48.05$29.50
Laborers: BUILDING CONSTRUCTION GROUP 1$41.10$32.90
GROUP 2$42.22$32.90
GROUP 3$43.45$32.90
Laborers: HEAVY & HIGHWAY GROUP 1$36.45$27.80
a GROUP 2$42.80$27.80
a GROUP 3$43.90$27.80
GLAZIER$49.20$57.20
Painters: Drywall Finishers$35.94$24.66
Lead Abatement Work$35.94$24.66
Painter/Paperhanger$35.94$24.66
Spray Rate$36.94$24.66
PLUMBER/PIPEFITTER$60.66$45.35
Plumber; Steamfitter$53.20$46.57
REFRIGERATION MECHANIC$41.99$37.38
ROOFER$50.25$32.62
SPRINKLER FITTER$57.20$32.66
Sheet metal worker$55.29$47.43
Truck drivers: GROUP 1$37.91$46.37
a GROUP 1A$39.03$46.37
a GROUP 2$37.35$46.37
a GROUP 3$37.13$46.37
a GROUP 4$37.02$46.37
a GROUP 5$36.90$46.37

Related Wage Determinations

View directory →