Skip to content
Davis-Bacon

NY20260031 (Rev 1)

Coverage: New York • Herkimer.

Published: Jan 30, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement$43.25$27.29
F WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system$38.50$25.04
BOILERMAKER$43.34$27.66
BRICKLAYER BRICKLAYERS & STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CLEANERS & CAULKERS$39.24$22.02
MARBLE, TILE & TERRAZZO WORKERS$35.85$20.37
MARBLE, TILE & TERRAZZO FINISHERS$28.52$19.59
CEMENT MASON/CONCRETE FINISHER$37.23$19.51
CARPENTER BUILDING CONSTRUCTION Carpenters, Millwrights$30.85$21.32
Piledriver$30.85$21.32
HEAVY & HIGHWAY CONSTRUCTION$44.52$27.16
CABLE SPLICER$55.55$35.03
ELECTRICIAN$50.50$35.03
Elevator Constructor$57.73$38.43
Power equipment operators: (BUILDING) GROUP A(1)$55.42$33.20
GROUP A$54.93$33.20
GROUP B$53.91$33.20
GROUP C$51.01$33.20
Power equipment operators: BUILDING GROUP 1$54.90$32.45
GROUP 2$53.99$32.45
GROUP 3$51.42$32.45
GROUP 4$57.01$32.45
Power equipment operators: HEAVY & HIGHWAY GROUP 1$57.30$33.55
GROUP 2$56.39$33.55
GROUP 3$53.82$33.55
GROUP 4$63.30$33.55
GROUP 5$61.80$33.55
GROUP 6$60.30$33.55
GROUP 7$58.91$33.55
Power equipment operators: HEAVY AND HIGHWAY GROUP 1$54.90$32.45
GROUP 4$60.90$32.45
GROUP 5$59.40$32.45
GROUP 6$57.90$32.45
GROUP 7$57.01$32.45
IRONWORKER Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman$35.50$31.39
Laborers: BUILDING CONSTRUCTION: Asbestos Removal$24.00$20.64
a Blasters, Form Setters, MotorBuggy Operator (Rider Type)$23.00$20.64
Hazardous waste removal includes, wetting,stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, wheather they contain asbestos or not, from mechanical systems)$24.00$20.64
a Laborers$22.50$20.64
a Pipelayers, Motor Mixers, Motor Buggy Operator (Walk Behind) Power Lift (Walk Behind)$22.65$20.64
a Wagon Drill Operator$22.90$20.64
a HEAVY & HIGHWAY CONSTRUCTION: GROUP 1$28.05$23.74
a GROUP 2$28.25$23.74
a GROUP 3$28.45$23.74
a GROUP 4$28.65$23.74
Painters: BUILDING CONSTRUCTION Brush & Roll, Drywall Taping/Finishing$27.27$26.23
Spray, Sandblasting, Structural Steel$27.77$26.23
HEAVY & HIGHWAY CONSTRUCTION Bridges$42.06$30.59
GLAZIER$30.00$27.59
PLUMBER (Including Steamfitting) Northern Zone$45.93$33.77
ROOFER$35.80$25.99
SPRINKLER FITTER$47.85$28.94
million$46.29$23.31

Related Wage Determinations

View directory →