- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
AWTS SWITCH MODULE
Presolicitation from DEPT OF THE NAVY • DEPT OF DEFENSE. Place of performance: NJ. Response deadline: Apr 29, 2026. Industry: NAICS 334515 • PSC 6625.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 334515 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 67 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 334515
Description
It is the Government's intention to go sole source to Eclypse International Corporation as they are the original designer, developer and manufacturer and the only source with the requisite knowledge, experience, technical expertise and technical data to provide these requirements. Any other source would need to possess the drawings/technical data to be able to perform this requirement.
The Eclypse International Corporation is the only known qualified source capable of satisfying the U.S. Navy's specific requirements. The technical drawing package for these items were designed by and is currently maintained solely by The Eclypse International Corporation. Therefore, the Government cannot provide the necessary technical details that fully capture the required specifications for this requirement to another contractor. Award to another source would require the need to reverse engineer and re-qualify equipment. This process would take an additional 24 months and result in unacceptable delays to the Government.
This delay would adversely affect the Squadrons ability to perform their everyday duties in supporting the Warfighter. Therefore, the efforts described herein cannot be performed by another source.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.