ROOF REPLACEMENT AT P/S 0115
CONTRACTOR WILL REPLACE ENTIRE ROOF, ANY ROTTED WOOD ON THE ROOF DECK, FASCIA AND VENTILATED SOFFIT, ALL PERMITS REQUIRED, NO ASBESTOS FOUND Technical Certification: Roofing Contractor
Strategic Procurement Department (SPD) opportunities often flow through multiple subagencies and contracting offices, each with different templates and amendment behavior. Use this hub to keep that activity in one place before final submission checks on SAM.gov.
CONTRACTOR WILL REPLACE ENTIRE ROOF, ANY ROTTED WOOD ON THE ROOF DECK, FASCIA AND VENTILATED SOFFIT, ALL PERMITS REQUIRED, NO ASBESTOS FOUND Technical Certification: Roofing Contractor
The project consist of furnishing all labor, materials and equipment to perform mechanical integrity testing (MIT) of nine (9) existing injection wells at the Central District Wastewater Treatment Plant (CDWWTP) and one (1) existing injection well at the South Miami Heights Water…
CONTRACTOR WILL REPLACE ENTIRE ROOF, DAMAGED ROOF DECK, DAMAGED SOFFIT AND DAMAGED FASCIA, PERMIT REQUIRED, NO ASBESTOS FOUNF Technical Certification: Roofing Contractor
The project consists of furnishing all materials, labor, and equipment necessary to upgrade the HVAC systems located at the Alexander-Orr WTP Lime Kiln Control room, including, but not limited to the demolition and removal of the existing air conditioning systems and exhaust…
Scope of Work shall include, but not be limited to: Provide all labor, equipment and materials at MIA Midfield Fire Station No. 12 to 1) replace existing lockers, repaint and refinish as required existing floor, walls, and ceilings; 2) replace existing ventilation…
The Contractor shall complete all WORK as per the signed and sealed Construction Documents approved by the Miami-Dade County Department of Regulatory and Economic Resources, and the Bid Documents, and not limited to, specifications, and the Permit Set provided by Miami-Dade County…
Scope of Work: (Contractor must obtain and submit all permits prior to performing any work.) Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required (including cleaning and preparation) to construct the Work in…
Remove and replace the existing HVAC system. Install a new in-duct mounted smoke detector and a roof curb for the package unit, Model: CARRIER 50TC-D16A2A5A0A0A0, Serial: 1116P04456. Fabricate and install all new ducts and a new equivalent package HVAC unit on the…
The Miami-Dade Public Library System (MDPLS) requires the construction services from a prime contractor for interior and exterior improvements of the existing Coconut Grove Branch Library building built in 1963 of approximately 7,899 square feet. The library branch located at 2875 McFarlane…
A. Work under this Contract includes but is not limited to the furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to connect the public sanitary sewer system nearby, with a new sewer pump station, force main extension,…
A. The project work shall take place at the Master Pump Station No. 1 (MPS1) which is owned and operated by the Miami-Dade Water and Sewer Department (OWNER). MPS1 is located at 390 NW North River Drive, Miami, Florida 33128. B. The…
This project is for the exterior improvements and a new full capacity generator for an estimated 80 dwelling units for Edison Plaza Elderly (FL5-056) located at 200 NW 55th St, Miami FL. The scope of work includes the replacement of all exterior…
The project consists of furnishing all materials, labor, and equipment necessary to provide an “Onsite Use Lift Station” at Booster Pumping Station 0418, including, but not limited to, excavation, demolition, installation, testing and modification work. For full list of project requirements please…
STATION 18T - 13810 NE 5 AVENUE, NORTH MIAMI, 33161 SCOPE OF WORK FOR STATION 18T: Project Overview: The work, in general consists of removal and dispose of any existing asphalt area, existing Canopy to be removed, existing adjacent trees to be…
This work involves disconnecting existing water meters from the service water lines located at the rear or side of the properties and connecting new water service lines of the residences to the existing water meter at the front of the property, as…
Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to: -Furnish, install, test, commission and integrate Network Video Recorders into an existing CCTV system that meets the specifications as defined in section 7…
9 notices close in the next 14 days on this page. Frequent issuing offices include Strategic Procurement Department (SPD).
Browse common filters found across the opportunities listed on this page.