Anticipated Annual Quarter to Advertise Solicitation
Anticipated Annual Quarter to Advertise Solicitation
Strategic Procurement Department (SPD) opportunities often flow through multiple subagencies and contracting offices, each with different templates and amendment behavior. Use this hub to keep that activity in one place before final submission checks on SAM.gov.
Follow how Strategic Procurement Department (SPD) is awarding work, which codes recur most often, and which subagencies or states are showing the strongest live signal on this hub.
Anticipated Annual Quarter to Advertise Solicitation
Scope of Work 1 Pages 1 - 8 Folio # 30-7909-028-0930 Work Site Address: 30505 SW 152 Court INSTALL SMOKE DETECTORS: Furnish and install battery-operated smoke…
Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment, permits and performing all operations required to perform…
The Project, including mobilization and demobilization, consists of all materials, labor, and equipment necessary to construct a fully operational PS No. 0374.…
1.00 SCOPE A. The project consists of furnishing all materials (except those listed in Section 4.00 “Materials and Equipment Furnished by The Department”),…
Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment, permits and performing all operations required to perform…
PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section describes the project in general and provides an overview of the extent of the work to be performed under…
Client’s name and address 1. Gabriela Labra 29945 SW 143 Court Homestead, Florida 33033 Approximated sq ft. 1,312 sq ft of wall surface. Exterior Paint Total…
1. Document Review The CONTRACTOR shall review all documents, specifications, plans, shop drawings, and the scope of work provided by the Miami Dade County…
Demolition of furniture and mostly all ceiling tiles have been performed previously. Any remaining items on site are to be disposed of by Demolition General…
This is an abbreviated scope of work and must be further enriched by the bid permit set included in the solicitation. Contractor must obtain and submit all…
Work includes, but is not limited to, providing all supervision, labor, required materials, equipment, tools, operations, and documentation necessary for the…
Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the…
Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the…
Work includes, but is not limited to, providing all supervision, labor, required materials, equipment, tools, operations, and documentation necessary for the…
The project consists of furnishing all materials (except those listed in Section 4.00 “Materials and Equipment Furnished by The Department”), labor, equipment,…
Scope of Work shall include, but not be limited to: Provide all labor, equipment and materials to renovate the MIA TSA Breakroom including installation of a…
The scope of work includes the replacement of 2 rooftop units, replacement of exhaust fan located on the roof level, replacement of ductwork as indicated on…
The Project, including mobilization and demobilization, consists of furnishing and installing approximately 6,300 linear feet of 8-inch ductile iron pipe and…
This project is for exterior and interior home accessibility upgrades to an existing single-family residence for Manor Park Residence (FL5-847) located at 1437…
4 notices close in the next 14 days on this page. Frequent issuing offices include Strategic Procurement Department (SPD) and PortMiami Procurement.
Browse common filters found across the opportunities listed on this page.