Skip to content
Miami-Dade County

MIAMI DADE AOWTP HVAC IMPROVEMENTS

Solicitation: RPQ No P20134
Notice ID: d4abfa1a6401136830a240dfa064fdae
DepartmentMiami-Dade CountyAgencyStrategic Procurement Department (SPD)StateFLPostedJan 29, 2026, 12:00 AM UTCDueMar 04, 2026, 03:00 PM UTCCloses in 9 days

Federal opportunity from Strategic Procurement Department (SPD) • Miami-Dade County. Place of performance: FL. Response deadline: Mar 04, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$964,691,384
Sector total $964,691,384 • Share 100.0%
Live
Median
$107,325
P10–P90
$28,414$4,168,590
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($964,691,384)
Deal sizing
$107,325 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for FL
Live POP
Place of performance
Miami-Dade County, FL
State: FL
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Miami-Dade County
Agency
Strategic Procurement Department (SPD)
Subagency
Strategic Procurement Department (SPD)
Office
Strategic Procurement Department (SPD)
Contracting Office Address
Not available

Description

The project consists of furnishing all materials, labor, and equipment necessary to upgrade the HVAC systems located at the Alexander-Orr WTP Lime Kiln Control room, including, but not limited to the demolition and removal of the existing air conditioning systems and exhaust fan, ductwork, lighting, and drop ceiling; furnish and install two split system air conditioning systems and associated refrigerant lines and support system, condensate drains, ductwork, and related equipment; furnish and install an exterior concrete equipment pad for the condensing units; furnish and install a supply fan, filter box, intake louver, and exhaust fan; furnish and install a drop ceiling and lighting; furnish and install HVAC controls, power, and associated equipment; mechanical work and electrical work; replacement of any sod, sidewalk, and pavement damaged during construction; and other appurtenant and miscellaneous items for a complete, satisfactory, and functional installation. It is the intent of the Department to obtain a complete and working installation under this Project and any items of labor, equipment or materials which may reasonably be assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on the Plans or stated herein. The Contractor shall furnish start-up and commissioning services including equipment startup and testing; piping testing; providing the services of field technicians and personnel by the Suppliers to provide the services for installation, startup, and training; coordination with the Department, Engineer, other contractors, and regulatory agencies. Bid submission must be electronic, through the Trimble Bid Portal, with a hard copy sent to WASD postmarked within one (1) business day of the bid submittal date, mailed to WASD [3071 SW 38th Avenue, Suite 107, Miami, FL 33146] The original Bid bond Security (in the form of a bid bond or cashier’s check) MUST be delivered to WASD, at the address above, BEFORE the bids are opened. Failure to deliver the original will result in the bid submission being rejected as non-responsive. Invited bidders should have received an Invitation to Bid with an Invitation Key linked to the Invitee’s email address. Upon request, an invitation can be sent to multiple email addresses within the same company. However, if multiple bids are submitted by the same company, ALL submitted bids will be rejected. The bid set includes electronic bid instructions. Training on electronic bid submission is available every Monday from 9 – 10 and every Wednesday from 1 – 2. Email the Contracting Officer or [email protected] for further information or to schedule training on alternative dates. The RFI cut-off date is five (5) business days prior to the bid due date. Liquidated Damages - $1,000.00 per day. The contractor must include in their bid package the following documents: 1. Appendix 5A, 2. Quotation Forms Pages, 3. Addendums, 4. Bid Bond - Note: A Bid Bond will be required only if the bid meets or exceeds $200K. In addition, a Performance and Payment Bond with additional insurance will be required once bid is Awarded and bid meets or exceeds $200K. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.
Technical Certification: General Building Contractor

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.