- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
FY26 USACE HOUSTON SHIP CHANNEL TEXAS EXPANSION CHANNEL IMPROVEMENTS PROJECT, EAST 2 CLINTON DMPA IMPROVEMENTS, HARRIS COUNTY, TX
Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: TX. Response deadline: Jan 08, 2026. Industry: NAICS 237990 • PSC Z1KB.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237990
Description
The primary objective of Package #8 Segment 4 East E2 Clinton (E2C) consists of constructing an upland dredged material confined placement area (DMPA) to receive maintenance dredging material from future dredging Project 11 - Segment 4, located within the Houston Ship Channel near the Washburn Tunnel Crossing in Houston, Texas.The specific items in the scope of work include clearing, grubbing and stripping; grading; construction of outfall channels, drainage channels, perimeter ditching and other drainage features; perimeter embankment construction; drop outlet structure construction; erosion control measures; site security measures; geotechnical construction testing; topographic surveys before the start of construction, and during and after construction activities; placement of topsoil, and hydromulch seeding; demobilization and site cleanup; and related ancillary work.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.