Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.
Solicitation from DEPT OF THE NAVY • DEPT OF DEFENSE. Place of performance: VA. Response deadline: Mar 02, 2026. Industry: NAICS 237130 • PSC Y1NZ.
Market snapshot
Awarded-market signal for NAICS 237130 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237130
Description
READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY.
YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL TO THE CONTRACT SPECIALIST.
Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil
Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Military Construction Project (MILCON) P732 focuses on electrical distribution system upgrades at the Gosport Substation within the Norfolk Naval Shipyard located in Portsmouth, Virginia. This Solicitation, numbered N6247026R0015, was posted on December 31, 2025, with a response deadline of March 2, 2026. Prospective bidders must request specifications via email from the contract specialist, Daniel Rocha.
The buyer is seeking contractors to execute a design-bid-build project that upgrades the electrical distribution system at the Gosport Substation.
- Review solicitation documents thoroughly
- Request specifications from the contract specialist
- Prepare a bid proposal
- Include pricing and compliance information
- Submit proposal by the deadline
- Bid proposal
- Pricing strategy
- Compliance documents
- Qualifications and experience
- Staffing plan
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific timelines for the start and end of performance
- Budget or estimated project cost
- Details on any environmental impact assessments required
- Clarification on previous upgrades or maintenance history at Gosport Substation
- Potential for follow-on contracts after project completion
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.