48--PARTS KIT,BALL VALV
Solicitation from DEPT OF THE NAVY • DEPT OF DEFENSE. Place of performance: PA. Response deadline: Mar 17, 2026. Industry: NAICS 332919 • PSC 4820.
Market snapshot
Awarded-market signal for NAICS 332919 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 332919
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO 9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; Combo Receiving Report & Invoice - Materials||TBD|N00104|TBD|N39040 - Certifications; S4306A - Materials|N50286|TBD|133.2|N/A|N/A|S4306A - Material|N/A|N/A|See DD1 423|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The purpose of this amendment is to update quantity as indicated below. All other terms and conditions remain the same. \ 1. THIS SOLICITATION IS BEING ISSUED UNDER EMERGENCY ACQUISITION FLEXIBILITIES. 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 4. Only those sources with an acceptable Quality Assurance Manual are eligible for award under this solicitation (see WSSTERMLZ02). 5. If drawings are included in the solicitation, access must be requested on the individual solicitation page on Contract Opportunities via the Government's SAM.gov website. Include your cage code with your request. 6. Unless otherwise stated on the DD 1423, submission of ALL DD form 1423 certification data (CDRLs) will be on or before 20 days prior to the material (line item 0001AA) delivery date. PNSY review/acceptance of CDRLs shall be 6 working days after receipt of CDRLs. Final delivery of material will be on or before TBD days after the effective date of the contract. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=2640-801X1E1 |53711| A|ER |D| | | | DRAWING DATA=7284929 |53711| D|DW |D| | | | DRAWING DATA=7285297 |53711| E| |D| | | | DRAWING DATA=8617511 |53711| N| |D| | | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B367 | | | |220401|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=SAE AMS 6931 | | |D |171201|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=MIL-PRF-9954 | | |D |090416|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;Parts Kit for a size 3 inch Ball Valve must be in accordance with NAVSEA Drawing 8617511 for one Ball, piece 62LI, NAVSEA Drawing 7285297 for two mating Seats, piece 22, and Engineering Report 2640-801X1E1, except as amplified or modified herein.; 3.2 ;Note Clarification: The note in Zone 6F of drawing 7285297 is missing punctuation that may cause misinterpretation that the slot is only required on pieces 30 & 33. The slot is required on all seats on drawing 7285297. The note must be punctuated as follows: 1 SLOT LOCATE AS SHOWN R.06 x .03 DEEP. SEE SECTION 2-6D FOR PC 30 & 33 ONLY.; 3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Ball; Material - SAE-AMS-6931 OR Centrifugally cast 6AL-4V, ASTM-B367, Grade C-5, with mechanical properties as listed in supplementary Requirement S6. Note: Mechanical properties for bars, forgings and forging stock over 10" must be as specified in the applicable drawing. If the mechanical properties are not provided in the drawing, the mechanical properties specified in SAE-AMS-6931 Table 2 for material 6" to 10", must be applied. Part - ;Seats (Q3); Material - Delrin: Dupont AF DE588 (Teflon Filled Acetal) (Properties Specified Below Only) ITEM PROPERTY ASTM TEST METHOD VALUE (A) Specific Gravity D792 (Note 1) 1.50 - 1.57 (B) Melting Point D2133 or D3418 172 - 184 deg C (342 - 363 deg F) (C) Tensile Strength (MIN) D638 (Notes 1 & 5) 6100 PSI (D) Tensile Impact (MIN) D1822 Type S (Notes 1 & 5) 5 FT-LB/SQ IN (E) Compressive Stress D695 2100 @ 1% DEF. (MIN - PSI) (Notes 1 & 5) 11,000 @ 10% DEF. (F) Water Absorption D570 .30% MAX 24 Hours (G) Rockwell Hardness (R) D785 (Note 1) 115 +/- 15 (H) Teflon Fiber Content (Note 2) 18 - 23% (I) Dimensional Change (Note 4) .7% MAX NOTES: 1. Material conditioning prior to test is at the vendor's option. 2. Teflon Fiber Content - As certified by DuPont (raw material). 3. Visual and Dimensional Inspection of Product (Final Machined Condition) - White Teflon string inclusions must not exceed the following: A. Diameter 1/32" B. Length 1/8" C. Density 6 indications per 100 SQ IN 4. The test method to determine dimensional stability must be performed as follows: The test specimens (finished pieces) tested must be measured at 23 +/- 3 deg C (73 +/- 5F) and placed in a mineral oil bath maintained at 160 +/- 3 deg C (320 +/- 5F) the specimens must remain in the bath for six (6) hours at temperature and allowed to slow cool in the bath at a rate not to exceed 23 +/- 3 deg C (73 +/- 5F) per hour. When the bath reaches 23 +/- 3 deg C (73 +/- 5F), the test specimens must be removed and measured. The percent change in each dimension, outside diameter, inside diameter and thickness must not be greater than the value specified. ^Mineral oil meets the specification as listed below: Description.......................Passes U.S.P. Test (USP XX, P.1143) Solubility........................Passes U.S.P. Test (USP XX, P.1143) Neutrality........................Passes U.S.P. Test (USP XX, P.532) Readily Carbonizable Substances...Passes U.S.P. Test (USP XX, P.532) Limit of Polynuclear Compounds....Passes U.S.P. Test (USP XX, P.532) Solid Paraffin....................Passes U.S.P. Test (USP XX, P.532) Specific Gravity @ 25 deg C (77 deg F).0.8600 to 0.8900 Viscosity @ 37.8 deg C (100F).....73.6 to 84.4 Centistokes (340-390 SUS) Flash Point Cleveland Open Cup....420 deg F (216C) (Typical) Refractive Index @ 20C (68F)......1.480 (Typical) 5. Values are minimum mean values. Individual specimen values may not vary more than 25% below the specified minimum mean value. Should one specimen exceed the 25% criteria, retest is required. Failure to meet the above criteria a second time is cause for rejection. 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Hydrostatic Test Item - Each Ball Performance - 30 minutes at ;1050 PSI; with stem hole plugged Acceptance - No weeping, leakage, or permanent deformation. The following may be substituted by manufacturers who do not posess a hydrostatic test fixture: Test - Dye Penetrant Inspection Item - Each Ball Performance - T9074-AS-GIB-010/271 Acceptance - S9074-AR-GIB-010A/278 (Castings) / MIL-STD-2035 (Wrought) Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.6 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.6.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.6.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.6.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.7 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.8 Ball Spherical Surface Finish - Spherical surfaces of valve balls must be finished as follows: Machine finish spherical surfaces of the valve ball to between 30 and 35 RHR; use lubricant. Grind, hone, or cup polish to 16 RHR maximum; use lubricant (light oil or soap solution). Grit blast with glass bead media (MIL-PRF-9954-MIL 10); use a 3/16 inch ID blasting nozzle (not supersonic type) 4 inches from ball at 75 PSI air pressure. The resulting surface finish should be less than 25 RHR.Perform final polish with SUPFINA Polishing Paste (Pink polishing paste, item code 10100244, Supfina Machine Company, North Kingstown, RI). Apply the SUPFINAPolishing Paste that is initially light pink in color over the entire surface of the ball with a brush and perform a low speed finishing process with both theball and a .250" thick wool pad (Style 22110, Aetna Felt Corporation, Allentown, PA^) turning at the same time with light pressure for approximately 30 seconds^^ (3 revolutions) of the entire surface of the ball. Once the light pink SUPFINA polishing paste that was applied to the surface of the ball turns a grey color, the final finishing process is complete. After the final finishingprocess is complete, the surface of the ball should have a matte dull appearance with a surface finish between RHR 12 and RHR 16. Clean ball with a warm, alkaline solution or a liquid nonionic detergent to remove SUPFINA polishing paste. ^ Reference customer number PLI00499 when ordering wool pad. ^^ CAUTION: Excessive time will cause the ball to be polished in violation of the process." 3.9 Ball Spherical Surface Waviness - Unless otherwise specified on drawing, all sealing area surfaces must have a spherical surface waviness which does not exceed 0.0005 inches of height per inch of spherical surface. Roughness and waviness ratings must apply in a direction which yields the maximum rating, normally perpendicular to the lay. 3.10 Seat Stack Height Measurement - To ensure that each seat is within tolerance, check each seat individually by measuring the seat height with the ball resting on the seat. Limits are determined by the ball diameter tolerance and the stack height tolerance combined. Refer to CSD171 for recommended methods to measure and calculate stack heights. CSD171 is available in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.11 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.12 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.13 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.13.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.13.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.13.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. …
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.