Skip to content
Department of Defense

Outfall 40 at HSAAP

Solicitation: W9123626RATBD
Notice ID: db13eda3638e4906913089e6c0d3d3cd
TypeSources SoughtNAICS 237990DepartmentDepartment of DefenseAgencyDept Of The ArmyStateTNPostedJan 21, 2026, 12:00 AM UTCDueFeb 06, 2026, 02:00 PM UTCExpired

Sources Sought from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: TN. Response deadline: Feb 06, 2026. Industry: NAICS 237990.

Market snapshot

Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$1,287,533,718
Sector total $33,072,247,130 • Share 3.9%
Live
Median
$551,853
P10–P90
$43,045$119,860,900
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
3.9%
share
Momentum (last 3 vs prior 3 buckets)
+48369%($1,282,231,886)
Deal sizing
$551,853 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for TN
Live POP
Place of performance
4509 W Stone Dr, Kingsport, TN 37660 • 37660
State: TN
Contracting office
Norfolk, VA • 23510-1096 USA

Point of Contact

Name
Philip Mathews
Email
philip.d.mathews@usace.army.mil
Phone
7572017029

Agency & Office

Department
DEPT OF DEFENSE
Agency
DEPT OF THE ARMY
Subagency
US ARMY CORPS OF ENGINEERS
Office
ENGINEER DIVISION NORTH ATLANTIC • ENDIST NORFOLK • W2SD ENDIST NORFOLK
Contracting Office Address
Norfolk, VA
23510-1096 USA

More in NAICS 237990

Description

Holston Army Ammunition Plant (HSAAP) is a Government-Owned, Contractor-Operated (GOCO) explosives production facility located in Kingsport, Tennessee. All production at HSAAP depends on river water. The HSAAP river water system was installed in the early 1940s and was originally designed for resiliency and sustainability; but the system has degraded over time.Due to temperature compliance issues, all the production channels and outfalls to the Arnott Branch have been directed to Channel 1976 and associated Outfall 40. Approximately 970 acres of the HSAAP site now feed into Outfall 40 from a storm run-off standpoint; however, the majority of flow in this channel and outfall is from once-through non-contact cooling water (NCCW) discharging from various production facilities on the site. With planned increases in production and cooling water flow, this channel and outfall will exceed permissible temperature impacts to the Arnott Branch as required by operation permits. The Project includes modifications to Outfall 40, which involves re-routing and channel improvements. Improvements include the construction of a new portion of channel that discharges directly into the Holston River, channel stabilization, and the abandonment of the existing weir and Outfall 40 into Arnott Branch. Construction of the new channel will include a 10-foot clearing on either side for maintenance and construction, along with a temporary road and turnaround on the eastern side for construction vehicles.Please see the attached document for further details

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.