Skip to content
Department of Energy

Beam Position Monitor (BPM) Major Assembly - Group A

Solicitation: AA-2026-03
Notice ID: c93a4ea44d5940d180fc21cddcd1529b
TypeCombined Synopsis SolicitationNAICS 334418PSC5999Set-AsideSBADepartmentDepartment of EnergyStateCAPostedApr 02, 2026, 12:00 AM UTCDueApr 10, 2026, 10:00 PM UTCCloses in 3 days

Combined Synopsis Solicitation from ENERGY, DEPARTMENT OF • ENERGY, DEPARTMENT OF. Place of performance: CA. Response deadline: Apr 10, 2026. Industry: NAICS 334418 • PSC 5999.

Market snapshot

Awarded-market signal for NAICS 334418 (last 12 months), benchmarked to sector 33.

12-month awarded value
$11,557,723
Sector total $51,860,703,287 • Share 0.0%
Live
Median
$89,012
P10–P90
$31,456$249,750
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.0%
share
Momentum (last 3 vs prior 3 buckets)
+119%($4,308,952)
Deal sizing
$89,012 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for CA
Live POP
Place of performance
Berkeley, California • United States
State: CA
Contracting office
Berkeley, CA • 94720 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
CA20260007 (Rev 3)
Match signal: state matchOpen WD
Published Jan 23, 2026California • Alpine, Amador, Butte +21
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1
Base $84.76Fringe $25.07
Rate
Area 2
Base $64.56Fringe $25.07
+247 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 247 more rate previews.
Davis-BaconBest fitstate match
CA20260007 (Rev 3)
Open WD
Published Jan 23, 2026California • Alpine, Amador, Butte +21
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1
Base $84.76Fringe $25.07
Rate
Area 2
Base $64.56Fringe $25.07
Rate
handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) AREA 1
Base $35.31Fringe $12.75
+246 more occupation rates in this WD
Davis-Baconstate match
CA20260012 (Rev 2)
Open WD
Published Jan 23, 2026California • San Luis Obispo
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+128 more occupation rates in this WD
Davis-Baconstate match
CA20260015 (Rev 2)
Open WD
Published Jan 23, 2026California • Ventura
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD
Davis-Baconstate match
CA20260025 (Rev 2)
Open WD
Published Jan 23, 2026California • Riverside
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+123 more occupation rates in this WD

Point of Contact

Name
Arielle Anoop
Email
aanoop@lbl.gov
Phone
Not available

Agency & Office

Department
ENERGY, DEPARTMENT OF
Agency
ENERGY, DEPARTMENT OF
Subagency
BERKELEY NATL LAB - DOE CONTRACTOR
Office
Not available
Contracting Office Address
Berkeley, CA
94720 USA

More in NAICS 334418

Description

​As of April 2, 2026 this RFP has been amended to include the attached Q&A document.

All other terms and conditions of this RFP remain the same.

_________________________________________________________________________

Dear Prospective Offeror,

The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2026-0​3 for ​ALS-U ​B​eam Position Monitor (BPM) Chassis Major Assembly - Group A


The RFP and associated documents (listed below) are attached hereto:

0.            RFP and Proposal Preparation Instructions

1.            Statement of Work; inclusive of all incorporated Drawings.

               ​Please view the following Google Drive​ for complete Technical documentation:

               https://drive.google.com/drive/u/0/folders/13NelDuL1PmIDCnSJztsTU8Z80iXokWMK

2.            Sample Subcontract

3.            Rep Cert Form (required with submission)

4.            Price Proposal​ Schedule, Attachment A (required with submission)

5.            ALS-U Quality Evaluation Survey (required with submission)

Timeline of Events:

RFP Release - ​M​arch 27, 2026

Questions for Clarification - no later than​ April 2, 2026

Submissions due - no later than ​A​pril 10, 2026

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.