Davis-Bacon
CA20260015 (Rev 2)
Coverage: California • Ventura.
Published: Jan 23, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems) | $56.32 | $26.52 |
| Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls) | $39.94 | $20.65 |
| terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) | $23.52 | $13.37 |
| BOILERMAKER | $51.98 | $42.11 |
| BRICKLAYER; MARBLE SETTER | $50.07 | $20.29 |
| MARBLE FINISHER | $43.38 | $15.36 |
| TILE FINISHER | $37.96 | $13.77 |
| TILE LAYER | $51.82 | $19.32 |
| TERRAZZO FINISHER | $42.11 | $14.67 |
| TERRAZZO WORKER/SETTER | $49.62 | $15.26 |
| CARPENTER (1) Carpenter, Cabinet Installer, Insulation Installer, Hardwood Floor Worker and acoustical installer | $52.24 | $26.18 |
| Millwright | $52.24 | $26.68 |
| Piledrivermen/Derrick Bargeman, Bridge or Dock Carpenter, Heavy Framer, Rock Bargeman or Scowman, Rockslinger, Shingler (Commercial) | $52.37 | $26.18 |
| Pneumatic Nailer, Power Stapler | $52.37 | $26.18 |
| Sawfiler | $52.34 | $26.18 |
| Scaffold Builder | $45.37 | $25.43 |
| Table Power Saw Operator | $52.34 | $26.18 |
| Diver (1) Wet | $901.92 | $26.18 |
| Standby | $450.96 | $26.18 |
| Tender | $442.96 | $26.18 |
| Assistant Tender | $418.96 | $26.18 |
| Drywall DRYWALL INSTALLER/LATHER | $52.24 | $26.18 |
| STOCKER/SCRAPPER | $21.45 | $11.27 |
| Modular Furniture Installer | $25.00 | $13.06 |
| Electricians: (All work within 32 road miles from the nearest base point) Cable Splicer | $58.40 | $31.72 |
| Electrician Transportation Systems Technician Journeyman Wireman - Street Lighting & Traffic Signals | $51.34 | $30.40 |
| Transportation Systems Technician - Street Lighting & Traffic Signals | $38.51 | $30.02 |
| Communications System Installer | $46.47 | $19.22 |
| ELEVATOR MECHANIC | $69.43 | $38.43 |
| OPERATOR: Power Equipment (DREDGING) (1) Leverman | $67.90 | $40.95 |
| Dredge dozer | $61.93 | $40.95 |
| Deckmate | $61.82 | $40.95 |
| Winch operator (stern winch on dredge) | $61.27 | $40.95 |
| Fireman-Oiler, Deckhand, Bargeman, Leveehand | $60.73 | $40.95 |
| Barge Mate | $61.34 | $40.95 |
| OPERATOR: Power Equipment (All Other Work) GROUP 1 | $63.40 | $33.20 |
| GROUP 2 | $64.18 | $33.20 |
| GROUP 3 | $64.67 | $33.20 |
| GROUP 4 | $65.96 | $33.20 |
| GROUP 6 | $66.18 | $33.20 |
| GROUP 8 | $66.29 | $33.20 |
| GROUP 10 | $66.41 | $33.20 |
| GROUP 12 | $66.58 | $33.20 |
| GROUP 13 | $66.68 | $33.20 |
| GROUP 14 | $66.71 | $33.20 |
| GROUP 15 | $66.79 | $33.20 |
| GROUP 16 | $66.91 | $33.20 |
| GROUP 17 | $67.08 | $33.20 |
| GROUP 18 | $67.18 | $33.20 |
| GROUP 19 | $67.29 | $33.20 |
| GROUP 20 | $67.41 | $33.20 |
| GROUP 21 | $67.58 | $33.20 |
| GROUP 22 | $67.68 | $33.20 |
| GROUP 23 | $67.79 | $33.20 |
| GROUP 24 | $67.91 | $33.20 |
| GROUP 25 | $68.08 | $33.20 |
| OPERATOR: Power Equipment (Cranes, Piledriving & Hoisting) GROUP 1 | $64.75 | $33.20 |
| GROUP 2 | $65.53 | $33.20 |
| GROUP 3 | $65.82 | $33.20 |
| GROUP 5 | $66.18 | $33.20 |
| GROUP 6 | $66.29 | $33.20 |
| GROUP 7 | $66.41 | $33.20 |
| GROUP 8 | $66.58 | $33.20 |
| GROUP 9 | $66.75 | $33.20 |
| GROUP 10 | $67.75 | $33.20 |
| GROUP 11 | $68.75 | $33.20 |
| GROUP 12 | $69.75 | $33.20 |
| GROUP 13 | $70.75 | $33.20 |
| OPERATOR: Power Equipment (Tunnel Work) GROUP 1 | $65.25 | $33.20 |
| GROUP 2 | $66.03 | $33.20 |
| GROUP 3 | $66.32 | $33.20 |
| GROUP 4 | $66.46 | $33.20 |
| GROUP 5 | $66.68 | $33.20 |
| GROUP 6 | $66.79 | $33.20 |
| GROUP 7 | $66.91 | $33.20 |
| IRONWORKER Fence Erector | $45.78 | $26.51 |
| Ornamental, Reinforcing and Structural | $50.70 | $35.15 |
| Asbestos Removal Laborer | $46.48 | $25.93 |
| LABORER (GUNITE) GROUP 1 | $55.88 | $23.77 |
| GROUP 2 | $54.93 | $23.77 |
| GROUP 3 | $51.39 | $23.77 |
| LABORER (TUNNEL) GROUP 1 | $53.60 | $25.74 |
| GROUP 2 | $53.92 | $25.74 |
| GROUP 3 | $54.38 | $25.74 |
| GROUP 4 | $55.07 | $25.74 |
| LABORER GROUP 1 | $46.48 | $25.95 |
| GROUP 2 | $47.03 | $25.95 |
| GROUP 3 | $47.58 | $25.95 |
| GROUP 4 | $49.13 | $25.95 |
| GROUP 5 | $49.48 | $25.95 |
| Brick Tender | $42.60 | $22.13 |
| Laborers: (HORIZONTAL DIRECTIONAL DRILLING) (1) Drilling Crew Laborer | $47.94 | $20.86 |
| Horizontal Directional Drill Operator | $49.96 | $20.86 |
| Electronic Tracking Locator | $51.96 | $20.86 |
| Laborers: (STRIPING/SLURRY SEAL) GROUP 1 | $49.30 | $23.97 |
| GROUP 2 | $50.60 | $23.97 |
| GROUP 3 | $52.61 | $23.97 |
| GROUP 4 | $54.35 | $23.97 |
| LABORER PLASTER CLEAN-UP LABORER | $46.17 | $25.97 |
| PLASTER TENDER | $48.72 | $25.97 |
| Painters: (1) Repaint Including Lead Abatement | $25.40 | $15.87 |
| High Iron & Steel | $32.12 | $16.03 |
| Journeyman Painter including Lead Abatement | $36.44 | $18.58 |
| Industrial | $41.42 | $19.04 |
| All other work | $36.44 | $18.58 |
| DRYWALL FINISHER/TAPER | $49.33 | $26.82 |
| GLAZIER | $53.05 | $30.64 |
| SOFT FLOOR LAYER | $45.15 | $19.43 |
| PLASTERER | $47.37 | $19.64 |
| CEMENT MASON/CONCRETE FINISHER | $47.70 | $27.07 |
| PLUMBER/PIPEFITTER Work ONLY on new additions and remodeling of bars, restaurant, stores and commercial buildings not to exceed 5,000 sq. ft. of floor space | $59.85 | $25.83 |
| Work ONLY on strip malls, light commercial, tenant improvement and remodel work | $44.29 | $24.16 |
| w additions and remodeling of bars, restaurant, stores and commercial buildings not to exceed 5,000 sq. ft. of floor space and work on strip malls, light commercial, tenant improvement and remodel work | $61.73 | $26.81 |
| Sewer & Storm Drain Work | $48.84 | $23.58 |
| ROOFER | $52.63 | $20.73 |
| SPRINKLER FITTER | $50.79 | $29.80 |
| SPRINKLER FITTER (Fire) | $58.60 | $33.65 |
| SHEET METAL WORKER | $45.48 | $30.05 |
| TRUCK DRIVER GROUP 1 | $41.59 | $35.69 |
| GROUP 2 | $41.74 | $35.69 |
| GROUP 3 | $41.87 | $35.69 |
| GROUP 4 | $42.06 | $35.69 |
| GROUP 5 | $42.09 | $35.69 |
| GROUP 6 | $42.12 | $35.69 |
| GROUP 7 | $42.37 | $35.69 |
| GROUP 8 | $42.62 | $35.69 |
| GROUP 9 | $42.82 | $35.69 |
| GROUP 10 | $43.12 | $35.69 |
| GROUP 11 | $43.62 | $35.69 |
| GROUP 12 | $44.05 | $35.69 |
Related Wage Determinations
View directory →Davis-Bacon
CA20260026 (Rev 2)
California • San Bernardino
Davis-Bacon
CA20260012 (Rev 2)
California • San Luis Obispo
Davis-Bacon
CA20260025 (Rev 2)
California • Riverside
Davis-Bacon
CA20260001 (Rev 2)
California • San Diego
Davis-Bacon
CA20260024 (Rev 2)
California • Orange
Davis-Bacon
CA20260002 (Rev 2)
California • Imperial