Skip to content
Department of Defense

17--NRP,FLAT PANEL A033, IN REPAIR/MODIFICATION OF

Solicitation: N0038326QLA11
Notice ID: b99a5c1e92d54a89865971fb6d7651d1
TypeSolicitationNAICS 336413PSC1730DepartmentDepartment of DefenseAgencyDept Of The NavyStatePAPostedFeb 03, 2026, 12:00 AM UTCDueFeb 11, 2026, 08:30 PM UTCExpired

Solicitation from DEPT OF THE NAVY • DEPT OF DEFENSE. Place of performance: PA. Response deadline: Feb 11, 2026. Industry: NAICS 336413 • PSC 1730.

DoD CMMC Readiness
Modern compliance support by Federal Bid Partners

CMMC support options for this DoD solicitation

As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.

Done-for-you service
CMMC start-to-finish with FBP
$2,000
Registered Practitioner logo
Guided by a Registered Practitioner with practical DoD workflow support.
  • Gap review, remediation roadmap, and implementation support
  • Policy package, evidence mapping, and submission prep
  • Designed for primes and subs across non-tech and tech work
Start CMMC with Federal Bid Partners →
AI-powered application
CMMC Pulsar™ start-to-finish
$399
CMMC Pulsar logo
First-of-its-kind CMMC Pulsar™ app to run your CMMC workflow with AI assistance.
  • Structured checklist, AI guidance, and progress tracking
  • Build evidence and controls with clearer next-step workflows
  • Ideal for teams that want speed plus affordability
Open CMMC Pulsar™ →
Solicitation context: N0038326QLA11. Requirements vary by acquisition and contract type; COTS-only exceptions may apply.

Market snapshot

Awarded-market signal for NAICS 336413 (last 12 months), benchmarked to sector 33.

12-month awarded value
$355,698,702
Sector total $20,505,221,051 • Share 1.7%
Live
Median
$97,445
P10–P90
$29,456$934,247
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
1.7%
share
Momentum (last 3 vs prior 3 buckets)
+3121%($334,280,622)
Deal sizing
$97,445 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for PA
Live POP
Place of performance
Not listed
State: PA
Contracting office
Philadelphia, PA • 19111-5098 USA

Point of Contact

Name
Telephone:
Email
KIMBERLY.FLORES12.CIV@US.NAVY.MIL
Phone
2156976549

Agency & Office

Department
DEPT OF DEFENSE
Agency
DEPT OF THE NAVY
Subagency
NAVSUP
Office
NAVSUP WEAPON SYSTEMS SUPPORT • NAVSUP WSS PHILADELPHIA • NAVSUP WEAPON SYSTEMS SUPPORT
Contracting Office Address
Philadelphia, PA
19111-5098 USA

More in NAICS 336413

Description

CONTACT INFORMATION|4|N792.10|T2Q|N/A|kimberly.flores12.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING (COMBO) TYPE||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|4||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular businessday after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: 90 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint foreach NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of 0 per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. All contractual documents related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Governments acceptance of the contractors proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.4.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: NRP,FLAT PANEL A033 ;1730 016281428; NSN , ;3429AS9303-1; Part Number, Shall be performed IAW: NRP,FLAT PANEL A033 ;Latest applicable; Publication (s). 1.4.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.5 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.6 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;3429AS9303; drawing number ( ;(30003); ) ;REVISION A; , Revision ;NAWCADLKE; and all details and specifications referenced therein. 1.7 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.8 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=3429AS4108 |30003| C| |C| | | | DRAWING DATA=3429AS9303 |30003| A| |C| | | | 3. REQUIREMENTS Unique Requirements The contractor/overhaul activity shall provide the repair procedure they will follow to NAWCADLKE engineering for review and approval prior to commencing repairs. The repair procedure shall be forwarded per the Overhaul/Repair Procedure CDRL provided in this document. NAWCADLKE engineering POC is Mitchell.r.friedman.civ@us.navy.mil. 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: NRP,FLAT PANEL A033 ;3429AS9303-1; P/N, ;1730 016281428; NSN, ;LATEST APPLICABLE; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, …

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.