Skip to content
Department of Defense

Coastwide Beach and Dune Ecosystem Restoration, Hancock County, MS

Solicitation: W9127826RA040
Notice ID: b3156cc86ea841c3b007383fac0cd70c
TypeSolicitationNAICS 237990PSCY1QADepartmentDepartment of DefenseAgencyDept Of The ArmyStateMSPostedFeb 23, 2026, 12:00 AM UTCDueMar 31, 2026, 07:00 PM UTCCloses in 36 days

Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: MS. Response deadline: Mar 31, 2026. Industry: NAICS 237990 • PSC Y1QA.

Market snapshot

Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$1,287,533,718
Sector total $33,099,079,469 • Share 3.9%
Live
Median
$551,853
P10–P90
$43,045$119,860,900
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
3.9%
share
Momentum (last 3 vs prior 3 buckets)
+48369%($1,282,231,886)
Deal sizing
$551,853 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for MS
Live POP
Place of performance
Hancock County, MS
State: MS
Contracting office
Mobile, AL • 36602-3630 USA

Point of Contact

Name
Terri Adams
Email
terri.m.adams@usace.army.mil
Phone
251-441-6500
Name
Elizabeth M. Trimble
Email
elizabeth.m.trimble@usace.army.mil
Phone
Not available

Agency & Office

Department
DEPT OF DEFENSE
Agency
DEPT OF THE ARMY
Subagency
US ARMY CORPS OF ENGINEERS
Office
ENGINEER DIVISION SOUTH ATLANTIC • ENDIST MOBILE • W074 ENDIST MOBILE
Contracting Office Address
Mobile, AL
36602-3630 USA

More in NAICS 237990

Description

The project entails shoreline improvements along approximately 5 miles of the mainland coast in Hancock County, Mississippi. As authorized, the work includes construction of a 150-foot-wide beach berm designed to improve coastal resilience and mitigate storm-related impacts. The berm will tie into either the elevation of the adjacent sidewalk along the existing seawall or the surrounding ground surface, whichever is lower, and will extend approximately 150 feet seaward from the seawall. To complete the berm construction, an estimated 300,000 cubic yards of sand will be sourced from an upland location, trucked in, and placed along the project area.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.