Coastwide Beach and Dune Ecosystem Restoration, Hancock County, MS
Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: MS. Response deadline: Mar 31, 2026. Industry: NAICS 237990 • PSC Y1QA.
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237990
Description
The project entails shoreline improvements along approximately 5 miles of the mainland coast in Hancock County, Mississippi. As authorized, the work includes construction of a 150-foot-wide beach berm designed to improve coastal resilience and mitigate storm-related impacts. The berm will tie into either the elevation of the adjacent sidewalk along the existing seawall or the surrounding ground surface, whichever is lower, and will extend approximately 150 feet seaward from the seawall. To complete the berm construction, an estimated 300,000 cubic yards of sand will be sourced from an upland location, trucked in, and placed along the project area.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.