Skip to content
Department of Transportation

WA FLAP SKAMAN 92135(1), Wind River Road Slide Reconstruction

Solicitation: 69056725B000013
Notice ID: af620148830e46749b8c8d25b2a261ad

Solicitation from FEDERAL HIGHWAY ADMINISTRATION • TRANSPORTATION, DEPARTMENT OF. Place of performance: WA. Response deadline: Jan 29, 2026. Industry: NAICS 237310 • PSC Y1LB.

Market snapshot

Awarded-market signal for NAICS 237310 (last 12 months), benchmarked to sector 23.

12-month awarded value
$678,599,575
Sector total $34,976,418,652 • Share 1.9%
Live
Median
$847,271
P10–P90
$92,431$3,981,542
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
1.9%
share
Momentum (last 3 vs prior 3 buckets)
+3459%($641,511,827)
Deal sizing
$847,271 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for WA
Live POP
Place of performance
Washington • United States
State: WA
Contracting office
Vancouver, WA • 98661 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
WA20260114 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Washington • Spokane
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $75.37Fringe $18.82
Rate
TILE FINISHER
Base $27.26Fringe $11.99
+42 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 42 more rate previews.
Davis-BaconBest fitstate match
WA20260114 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Spokane
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $75.37Fringe $18.82
Rate
TILE FINISHER
Base $27.26Fringe $11.99
Rate
TILE SETTER
Base $36.35Fringe $14.57
+41 more occupation rates in this WD
Davis-Baconstate match
WA20260110 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Pend Oreille
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $75.37Fringe $18.82
Rate
TILE FINISHER
Base $27.26Fringe $11.99
Rate
TILE SETTER
Base $36.35Fringe $14.57
+33 more occupation rates in this WD
Davis-Baconstate match
WA20260130 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Spokane
Rate
ELECTRICIAN
Base $49.55Fringe $19.09
Rate
Line Construction: LINE PERSON
Base $64.17Fringe $23.58
Rate
TREE TRIMMER: Ground Person
Base $22.60Fringe $16.37
+31 more occupation rates in this WD
Davis-Baconstate match
WA20260021 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Adams
Rate
BRICKLAYER
Base $33.95Fringe $19.33
Rate
TILE SETTER
Base $29.86Fringe $13.95
Rate
CARPENTER (Including Drywall Hanging and Form Work)
Base $44.21Fringe $17.28
+28 more occupation rates in this WD

Point of Contact

Name
Contracts G. Office
Email
wfl.contracts@dot.gov
Phone
3606197520

Agency & Office

Department
TRANSPORTATION, DEPARTMENT OF
Agency
FEDERAL HIGHWAY ADMINISTRATION
Subagency
690567 WESTERN FEDERAL LANDS DIV
Office
Not available
Contracting Office Address
Vancouver, WA
98661 USA

More in NAICS 237310

Description

Solicitation from FEDERAL HIGHWAY ADMINISTRATION • TRANSPORTATION, DEPARTMENT OF. Place of performance: WA. Response deadline: Jan 29, 2026. Industry: NAICS 237310 • PSC Y1LB.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.