Davis-Bacon
WA20260130 (Rev 1)
Coverage: Washington • Spokane.
Published: Jan 23, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN | $49.55 | $19.09 |
| Line Construction: LINE PERSON | $64.17 | $23.58 |
| TREE TRIMMER: Ground Person | $22.60 | $16.37 |
| TREE TRIMMER | $42.57 | $17.97 |
| POWER EQUIPMENT OPERATOR Group 1 | $38.17 | $23.40 |
| Group 2 | $38.56 | $23.40 |
| Group 3 | $39.31 | $23.40 |
| Group 4 | $39.51 | $23.40 |
| Group 5 | $39.71 | $23.40 |
| Group 6 | $40.05 | $23.40 |
| Group 8 | $42.36 | $23.40 |
| IRONWORKER | $43.40 | $32.77 |
| LABORER: Common or General | $37.13 | $16.90 |
| TRAFFIC CONTROL: Flagger | $34.03 | $16.90 |
| LABORER: Nozzle Person | $52.31 | $17.01 |
| PAINTER | $41.24 | $14.70 |
| CEMENT MASON/CONCRETE FINISHER | $40.89 | $18.64 |
| TRUCK DRIVER: Asphalt Mix | $55.43 | $27.52 |
| CARPENTER | $39.31 | $3.42 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $36.96 | $8.56 |
| LABORER: Concrete Saw Chain | $36.24 | $10.89 |
| LABORER: Hod Carrier | $35.06 | $10.94 |
| LABORER: Mason Tender - Cement/Concrete | $27.51 | $2.96 |
| LABORER: Pipelayer | $37.55 | $0.00 |
| LABORER: Fence Erector | $30.21 | $0.00 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $34.52 | $12.78 |
| OPERATOR: Crane | $31.97 | $15.15 |
| OPERATOR: Forklift | $45.93 | $19.20 |
| OPERATOR: Loader | $34.44 | $13.37 |
| OPERATOR: Mechanic | $38.91 | $18.60 |
| PILEDRIVER PERSON | $36.50 | $10.16 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $30.61 | $10.89 |
| TRUCK DRIVER: Dump Truck | $31.24 | $18.60 |
| TRUCK DRIVER: Water Truck | $31.62 | $16.84 |