Davis-Bacon
WA20260110 (Rev 1)
Coverage: Washington • Pend Oreille.
Published: Jan 23, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems) | $75.37 | $18.82 |
| TILE FINISHER | $27.26 | $11.99 |
| TILE SETTER | $36.35 | $14.57 |
| CARPENTER | $44.21 | $17.28 |
| DRYWALL HANGER | $44.21 | $17.28 |
| ELECTRICIAN | $49.55 | $19.09 |
| OPERATOR: Backhoe/Excavator/Trackhoe 45,000 GW & Under | $42.71 | $23.40 |
| GW to 110,000 GW | $43.05 | $23.40 |
| Over 110,000 GW | $43.39 | $23.40 |
| IRONWORKER | $43.40 | $32.77 |
| LABORER: Common or General | $37.13 | $16.90 |
| LABORER: Grade Checker | $40.21 | $16.90 |
| LABORER: Pipelayer | $37.80 | $16.90 |
| LABORER: Hod Carrier | $38.05 | $16.75 |
| LABORER: Form Stripping | $50.38 | $16.96 |
| LABORER: Jackhammer | $51.52 | $16.99 |
| LABORER: Nozzle Person | $52.31 | $17.01 |
| Laborer, Mason Tender Brick | $50.38 | $16.96 |
| LABORER: Fire Watch | $40.56 | $15.60 |
| PAINTER | $41.24 | $14.70 |
| DRYWALL FINISHER/TAPER | $37.46 | $18.42 |
| CEMENT MASON/CONCRETE FINISHER | $40.89 | $18.64 |
| PLUMBER | $47.15 | $27.20 |
| PIPEFITTER | $65.20 | $34.91 |
| ROOFER, Excludes Metal Roofs | $35.64 | $14.89 |
| SHEETMETAL WORKER (including metal roofing) | $45.83 | $27.92 |
| TRUCK DRIVER: Concrete Truck | $55.43 | $27.52 |
| TRUCK DRIVER: Dump Truck | $40.22 | $20.93 |
| OPERATOR: Concrete Pump | $52.92 | $22.63 |
| OPERATOR: Drill | $56.42 | $21.15 |
| ELEVATOR MECHANIC | $53.78 | $22.86 |
| GLAZIER | $23.07 | $3.99 |
| LABORER: Concrete Saw Chain | $35.03 | $10.86 |
| LABORER: Mason Tender - Cement/Concrete | $29.14 | $12.05 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $40.53 | $9.56 |
| OPERATOR: Oiler | $36.39 | $16.62 |