- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
DSCR B41 Parking Lot Repair
Solicitation from DEFENSE LOGISTICS AGENCY • DEPT OF DEFENSE. Place of performance: VA. Response deadline: Apr 01, 2026. Industry: NAICS 237310 • PSC Z1LB.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 237310 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 43 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 237310
Description
Solicitation
Defense Supply Center Richmond (DSCR) B41 Parking Lot Repair
This is a solicitation for services prepared in accordance with the format in FAR Part 12, as supplemented with additional information included in this notice. The solicitation number SP4703-26-Q-0027 is issued as a request for quote (RFQ). The resulting contract will be a firm-fixed price award with an expected Period of Performance of 60 days from the issuance of the contract award. This acquisition is set-aside for 100% small businesses. The North American Industry Classification System (NAICS) Code is 237310 (Parking Lot Repair). The small business size standard is $45M. Department of Labor Wage Determination based on location of the service provided (Richmond, VA). Partial proposals will not be accepted.
For an offer to be considered for award, the contractor must be within a commutable driving distance to the DSCR facility. The point of mobilization must be annotated on the quote, and must be a location owned by the prime contractor, not a subcontractor. A 120-mile radius from DSCR is considered the commutable radius for this project.
Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions includes in this notice. Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS.
The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote.
All inquiries must be submitted no later than 7 business days prior to closing date. Acceptable method of quote or inquiries submission is Email to brandon.jump@dla.mil.
Site visit March 25, 2026 at 13:00. Coordinate site access with Robert Miller at Robert.C.Miller@dla.mil. Meeting point is the DSCR Visitor’s Center unless instructed otherwise.
Questions are due on March 31, 2026, end of day. Submit questions via email to Brandon.Jump@dla.mil.
Quotes are due April 7, 2026, end of day.
Access to Defense Supply Center Richmond is dictated by the language at the following location:
https://www.dla.mil/Aviation/Installation/Visitors-and-ID-Office/
The points of contact (POC) for this requirement are Brandon Jump (brandon.jump@dla.mil).
Reference Attachment 1 - Statement of Work (SOW) for additional work scope and details. Use the site map on the last page of the SOW.
MAGINITUDE OF CONSTRUCTION
36.204 Disclosure of the magnitude of construction projects. | Acquisition.GOV
In accordance with FAR Part 36.204(b), the estimated Magnitude of Construction for requirement is between $25,000 and $100,000.
LIQUIDATED DAMAGES
52.211-12 Liquidated Damages-Construction.
LIQUIDATED DAMAGES-CONSTRUCTION (SEPT 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of _$500_ for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
DIBBS / DLA Details
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.