- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
731st CE Munitions Storage Area (MSA) Soil Repair
Combined Synopsis Solicitation from DEPT OF THE AIR FORCE • DEPT OF DEFENSE. Place of performance: Campia Turzie, Cluj • Romania. Response deadline: Jan 16, 2026. Industry: NAICS 237990 • PSC Y1PZ.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237990
Description
The U.S. Air Force requires the restoration of proper soil compaction, erosion protection, and vegetation coverage on Earth Covered Magazine (ECM) facility in accordance with Attachment 2, Statement of Work.
Need date: 01 Feb 2026.
Place of Delivery/Performance/Acceptance/FOB Point:
Destination: Baza 71 Aeriana Str, Campia Turzii, Ro 405100.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The U.S. Air Force seeks a contractor to perform soil repair work at the Earth Covered Magazine (ECM) facility. The project includes restoration of soil compaction, erosion control, and vegetation coverage, with a proposal deadline set for January 16, 2026.
The buyer aims to contract a service provider for soil repair to ensure safe and effective use of the munitions storage area.
- Review Statement of Work and attachments for detailed requirements.
- Conduct site assessment to understand the current conditions of the ECM facility.
- Develop a project plan including timelines and resource allocation.
- Prepare and submit a detailed proposal and pricing strategy.
- Ensure compliance with safety and environmental regulations.
- Completed proposal including pricing.
- Technical approach detailing methods for soil repair.
- Company qualifications and relevant experience.
- Timeline for project execution.
- Compliance documents as per solicitation requirements.
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Details on specific soil conditions requiring repair.
- Information on the maximum budget for the project.
- Clarification on required certifications and licenses.
- Site access challenges or concerns that may affect work.
- Any local regulations that must be considered during project execution.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.