10--REPAIR PARTS KIT,CU
Combined Synopsis Solicitation from DEFENSE LOGISTICS AGENCY • DEPT OF DEFENSE. Place of performance: OH. Response deadline: Feb 19, 2026. Industry: NAICS 332994 • PSC 10.
Market snapshot
Awarded-market signal for NAICS 332994 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 332994
Description
Proposed procurement for NSN 1075005071210 REPAIR PARTS KIT,CU: Line 0001 Qty 11 UI KT Deliver To: NAVAL SUPPLY CENTER By: 0020 DAYS ADO The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
DIBBS / DLA Details
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
DLA Land and Maritime (Defense Logistics Agency) issued Combined Synopsis/Solicitation SPE7L126T061H for NSN 1075005071210, REPAIR PARTS KIT,CU. The RFQ is for Line 0001, quantity 11 (UI: KT) with delivery to NAVAL SUPPLY CENTER required within 20 days ADO. Quotes must be submitted electronically, and the solicitation is only available via the SAM.gov link in the notice (no hard copies). Digitized drawings and Military Specifications/Standards may need to be retrieved electronically to quote accurately.
Rapidly procure 11 kits of NSN 1075005071210 (REPAIR PARTS KIT,CU) under an RFQ issued by DLA Land and Maritime, with delivery to NAVAL SUPPLY CENTER due within 20 days after date of order, using electronic submission and electronically accessed drawings/specs/standards.
- Access and review RFQ SPE7L126T061H via the SAM.gov link in the notice (electronically only).
- Validate NSN 1075005071210 requirements for REPAIR PARTS KIT,CU and confirm Line 0001 (Qty 11, UI KT).
- Retrieve and review any digitized drawings and applicable Military Specifications and Standards referenced by the RFQ.
- Confirm ability to meet delivery requirement: deliver to NAVAL SUPPLY CENTER within 20 days ADO.
- Prepare and submit an electronic quote by the response deadline (2026-02-19).
- Electronic quote submission (as required by the notice).
- Acknowledgment of Line 0001: NSN 1075005071210, REPAIR PARTS KIT,CU; Qty 11; UI KT.
- Proposed delivery schedule explicitly confirming delivery to NAVAL SUPPLY CENTER within 20 days ADO.
- Any required compliance statements tied to the RFQ’s referenced drawings and Military Specifications/Standards (as applicable once reviewed).
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Set-aside status (blank in notice).
- Exact delivery address details for NAVAL SUPPLY CENTER (ship-to DODAAC/address not shown in notice text).
- RFQ technical requirements: kit contents, drawings, and referenced Military Specifications/Standards (must be pulled from the RFQ).
- Packaging/marking/inspection requirements (not provided in notice text).
- Evaluation/award basis and any required certifications/representations (not provided in notice text).
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.