- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
VALVE,BALL
Solicitation from DEPT OF THE NAVY • DEPT OF DEFENSE. Place of performance: PA. Response deadline: Mar 27, 2026. Industry: NAICS 332919 • PSC 4820.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 332919 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 332919
Description
CONTACT INFORMATION|4|N742.16|WVN|N/A|robert.h.langel.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specifications Section C and Section E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| DESIRED AND REQUIRED TIME OF DELIVERY (JUNE 1997)|29|CLIN 0001AA|8|365||||||||||||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|TBD|N50286 QTY 8|TBD|TBD|N/A|N/A|TBD|N/A|N /A|See form DD1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECH| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||x| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13||x|||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024)|4|332919|750||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2|x|| The purpose of this amendment is to allow time for NOFORN drawings to be sent to vendors. \ The drawings for this solicitation have now been posted to the GPE, and the close date has been updated accordingly. Due to a delay in drawings being posted, this solicitation will be extended for 30 days. 1.This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2.The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3.All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4.If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 5.Any contract awarded as a result of this solicitation will be DX certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 6.If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.gov website. After requesting access, send an email to the POC listed on the solicitation. 7.NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers IAW FAR 13.106(a)(2). 8.Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 9.This requirement requires access to NOFORN and/or Naval Nuclear Propulsion Information. See local text WSSTERMHZ12 for further information. If you wish to obtain a copy of the drawings, please download the security agreement form from SAM.gov and email the completed, signed form to robert.h.langel.civ@us.navy.mil. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. DRAWING DATA=2445483 |80064| E| |F| | | | DRAWING DATA=2640-808X1J1 |96169| A| |D| | | | DRAWING DATA=2642-742-01F4 |96169| A| |D| | | | DRAWING DATA=4558709 |80064| E| |D| | | | DRAWING DATA=7286250 |53711| J| |D| | | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A|2 | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=ASTM-B367 | | | |220401|A| | | DOCUMENT REF DATA=ASTM-B369 | | | |240701|A| | | DOCUMENT REF DATA=ASTM-B505 | | | |180301|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=ASTM-E1417 | | | |160615|A| | | DOCUMENT REF DATA=ASTM-E1444 | | | |160601|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ASTM-D4066 | | | |130701|A| | | DOCUMENT REF DATA=SAE AMS 6931 | | |D |171201|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=MIL-PRF-9954 | | |D |090416|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=MIL-C-15726 | | |F |911008|A|1 | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=QPL 25027 | | |17 |000207|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |081118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=AIA/NAS NASM 17828 | | |1 |130430|A| | | DOCUMENT REF DATA=AIA/NAS NASM 25027 | | |1 |121221|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;Complete 1 in Ball Valve must be in accordance with NAVSHIPS Drawing 845-4558730, Assembly "IRAWTB", ER2642-742-01F4, and ER2640-808X1J1, with the Stem modified to Drawing 845-2445483 Assembly "DS", except as amplified or modified herein.; 3.2 ;The Nut, piece 343, must be manufactured in accordance with 2641-742, item 21, as modified to NAVSHIPS Drawing 845-2445483 Assembly "DS".; 3.3 ;Material for Nut, piece 343, to be ASTM-B505, Alloy UNS C90300.(Certification of Quantitative chemical and mechanical analysis is not required.); 3.4 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, item 2 of Drawing 845-4558730; Material - ;ASTM-B369, UNS C96400; Part - ;Tailpiece, item 5 of Drawing 845-4558730; Material - ;MIL-C-15726, Alloy C71500 (Mechanical properties to be in accordance with General Note 26 on Drawing 845-4558730); Part - ;Stud, item 36 of Drawing 845-4558730; Material - ;MIL-DTL-1222 Grade 500 (QQ-N-286), Type IV, Annealed and Age Hardened; PART - ;Self-Locking Hex Nut, item 26 of Drawing 845-4558730; MATERIAL - QQ-N-281, class A annealed (hot finished or cold drawn) or class B cold drawn. All material must be from the same class. SELF-LOCKING ELEMENT- ASTM-D4066, Group 01, Class 1, Grade 1 Part - ;Ball, item 35 of Drawing 845-4558730; Material - SAE-AMS-6931 OR Centrifugally cast 6AL-4V, ASTM-B367, Grade C-5, with mechanical properties as listed in supplementary Requirement S6. Note: Mechanical properties for bars, forgings and forging stock over 10" must be as specified in the applicable drawing. If the mechanical properties are not provided in the drawing, the mechanical properties specified in SAE-AMS-6931 Table 2 for material 6" to 10", must be applied. Part - ;Seats (Q3), item 21 of Drawing 845-2109895; Material - Delrin: Dupont AF DE588 (Teflon Filled Acetal) (Properties Specified Below Only) ITEM PROPERTY ASTM TEST METHOD VALUE (A) Specific Gravity D792 (Note 1) 1.50 - 1.57 (B) Melting Point D2133 or D3418 172 - 184 deg C (342 - 363 deg F) (C) Tensile Strength (MIN) D638 (Notes 1 & 5) 6100 PSI (D) Tensile Impact (MIN) D1822 Type S (Notes 1 & 5) 5 FT-LB/SQ IN (E) Compressive Stress D695 2100 @ 1% DEF. (MIN - PSI) (Notes 1 & 5) 11,000 @ 10% DEF. (F) Water Absorption D570 .30% MAX 24 Hours (G) Rockwell Hardness (R) D785 (Note 1) 115 +/- 15 (H) Teflon Fiber Content (Note 2) 18 - 23% (I) Dimensional Change (Note 4) .7% MAX NOTES: 1. Material conditioning prior to test is at the vendor's option. 2. Teflon Fiber Content - As certified by DuPont (raw material). 3. Visual and Dimensional Inspection of Product (Final Machined Condition) - White Teflon string inclusions must not exceed the following: A. Diameter 1/32" B. Length 1/8" C. Density 6 indications per 100 SQ IN 4. The test method to determine dimensional stability must be performed as follows: The test specimens (finished pieces) tested must be measured at 23 +/- 3 deg C (73 +/- 5F) and placed in a mineral oil bath maintained at 160 +/- 3 deg C (320 +/- 5F) the specimens must remain in the bath for six (6) hours at temperature and allowed to slow cool in the bath at a rate not to exceed 23 +/- 3 deg C (73 +/- 5F) per hour. When the bath reaches 23 +/- 3 deg C (73 +/- 5F), the test specimens must be removed and measured. The percent change in each dimension, outside diameter, inside diameter and thickness must not be greater than the value specified. ^Mineral oil meets the specification as listed below: Description.......................Passes U.S.P. Test (USP XX, P.1143) Solubility........................Passes U.S.P. Test (USP XX, P.1143) Neutrality........................Passes U.S.P. Test (USP XX, P.532) Readily Carbonizable Substances...Passes U.S.P. Test (USP XX, P.532) Limit of Polynuclear Compounds....Passes U.S.P. Test (USP XX, P.532) Solid Paraffin....................Passes U.S.P. Test (USP XX, P.532) Specific Gravity @ 25 deg C (77 deg F).0.8600 to 0.8900 Viscosity @ 37.8 deg C (100F).....73.6 to 84.4 Centistokes (340-390 SUS) Flash Point Cleveland Open Cup....420 deg F (216C) (Typical) Refractive Index @ 20C (68F)......1.480 (Typical) 5. Values are minimum mean values. Individual specimen values may not vary more than 25% below the specified minimum mean value. Should one specimen exceed the 25% criteria, retest is required. Failure to meet the above criteria a second time is cause for rejection. Part - ;Stem, item 15 of Drawing 845-4558730, (details on Drawing 2641-742, item 19) and modified to NAVSHIPS Drawing 845-2445483, Assembly "DS", consisting of Stem, piece 104, Nut, piece 343, and Bushing, piece 503. (NOTE: Stem is a Type 3 vice Type 1 on NAVSHIPS Drawing 845-2445483.); Material - ;QQ-N-286, Form 2, Annealed and Age Hardened; 3.5 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - ;Liquid Penetrant Inspection; Item - ;Studs, item 36; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;Dye Penetrant Inspection for Non-Magnetic Grades; Item - ;Self-Locking Hex Nut, item 26; Performance - T9074-AS-GIB-010/271 or ASTM-E1417/ASTM-E1444 (Method C solvent removal techniques must not be used on thread) Acceptance - ;NASM25027; Test - Quality Conformance Tests Item - Self-Locking Nuts Performance - ;NASM25027; Acceptance - ;NASM25027; Attribute - Certificate of Completion Item - Self-Locking Nut Nonmetallic Insert Performance - ;ASTM-D4066, Group 01, Class 1, Grade 1; Attribute - Certificate of Compliance Item - Self-Locking Nuts Performance - This Certificate must state that self-locking nuts were manufactured by an approved source. Approved sources are those listed on QPL-25027 for the appropriate fastener. This QPL may also be considered as approved sources for Heavy Hex self-locking nuts. Test - Weldability Test of ASTM-B369 material Item - ;Body, item 2; Performance - ASTM-B369 Acceptance - ASTM-B369 Attribute - Annealing and Age Hardening Item - ;Stem, item 15 and Stud, item 36; Performance - QQ-N-286 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Test - Pressure Tests Item - Each Assembly Performance - ;Drawing 4558730 note 7 as modified by ER2642-742-01F4; Acceptance - ;Drawing 4558730 note 7 as modified by ER2642-742-01F4; 3.6 Radiography is required on ;the Body, item 2; . 3.7 Thread Forming - The following provides the official interpretation of paragraph 4.5.2.7 of MIL-DTL-1222. 3.7.1 In order to qualify for "Alternate Mechanical Testing" found in MIL-DTL-1222J paragraph 4.5.2.7 and utilize the mechanical properties for the starting bar stock in lieu of performing yield strength or proof stress testing on finished fasteners, all of the subsequent provisions found in MIL-DTL-1222J paragraphs 4.5.2.7 a through e must be met. If any single provision is not met, all required mechanical testing must be performed on the finished full sized fasteners. These provisions are explained as follows: a. Proper product lot control and traceability must be in place. b. No heat treatment (including hot heading and hot forming), cold forming, drawing, rolling and thread rolling may be performed on the starting bar, fastener blanks or finished fasteners after the completion of the mechanical testing on the starting bar. c. and d. The proper size starting bar must be selected to ensure mechanical properties of finished fasteners are represented by the mechanical properties of the starting bar. e. The mandatory testing, axial tensile (studs) and wedge tensile (screws and bolts) must be performed on full sized fasteners. Note that there is a typographical error in paragraph 4.5.2.7 and that the axial load test is a mandatory test that must be performed on studs as required in paragraph 4.5.2.7.e. 3.7.2 Thread rolling is a cold working process and is not considered to be a machining or grinding operation. Therefore, fasteners which have rolled threads do not satisfy the provisions of MIL-DTL-1222J paragraph 4.5.2.7.b and are not eligible for the "Alternate Mechanical Testing" provision. 3.7.3 Thread rolling alone is not a sufficient cold working process to qualify a fastener to be in the cold worked (CW) condition. This condition is only applicable to some 300 series stainless steel studs, screws and nuts. These CW condition fasteners must be manufactured from cold worked bar stock or be cold headed in order to qualify. The threads may subsequently be rolled, machined or ground. Testing of the finished fasteners and/or reporting of the starting bar stock material properties is subject to the same provisions found in MIL-DTL-1222J paragraph 4.5.2.7 and discussed above. 3.8 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/. 3.9 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, …
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.