- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Fort Chaffee Arkansas Fueling System Repairs
Sources Sought from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: 72905. Response deadline: Mar 13, 2026. Industry: NAICS 237120.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237120
Description
This project includes fuel system repairs at the Fort Chaffee retail and bulk fuel facilities. At the service station: Modify the three 8,000 gallon aboveground fuel storage tanks (AST?s) and appurtenances (including tank draining, cleaning, and disposal of any remaining product); Remove and dispose of three dispensers; Install three 12,000 gallon AST?s on new concrete pad; Repair dispensers (Two (2) diesel, One (1) MOGAS ) on new islands; Install offload point; Install parking hardstand area and spill containment system; AST work includes shut off valves, strapping charts, and catwalks; Install bollards; Repair emergency shut off system; Repair site lighting; Replace equipment building; Repair pavement. Construct a new steel framed canopy estimated to being 41.5 feet x 125 feet. Constructing new metal canopy construction and the associated foundation construction required. Foundation removal experience. At the bulk fuel facility: At the 3 AST?s provide catwalk, high level shut off, mechanical level gauge, water draw off, and strapping charts; Provide offload pumps, site flow indicator, offload meter Teflon pads, air eliminator, pressure relief valves, product recovery tanks, dispenser sumps; Replace fillstand pump, fuel piping, filter separator, undersized piping, threaded piping and valves, and dispensers; Install pipe supports; Remove transfer piping; Add level alarm; Repair pipe supports; Install bollards. All Contractors working at Fort Chaffee must be a licensed commercial contractor registered with the Contractors Licensing Board in Arkansas. Contractors will have experience installing brand new UL 2085 horizontal jet fuel (F-24) ASTs and installing meter proving connections.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.