Skip to content
Department of Defense

Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.

Solicitation: N6247026R0015
Notice ID: 60553769a42d4e1697060c7db9c7eb36
TypeSolicitationNAICS 237130PSCY1NZSet-AsideNONEDepartmentDepartment of DefenseAgencyDept Of The NavyStateVAPostedFeb 25, 2026, 12:00 AM UTCDueMar 18, 2026, 07:00 PM UTCCloses in 21 days

Solicitation from DEPT OF THE NAVY • DEPT OF DEFENSE. Place of performance: VA. Response deadline: Mar 18, 2026. Industry: NAICS 237130 • PSC Y1NZ.

DoD CMMC Readiness
Modern compliance support by Federal Bid Partners

CMMC support options for this DoD solicitation

As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.

Done-for-you service
CMMC start-to-finish with FBP
$2,000
Registered Practitioner logo
Guided by a Registered Practitioner with practical DoD workflow support.
  • Gap review, remediation roadmap, and implementation support
  • Policy package, evidence mapping, and submission prep
  • Designed for primes and subs across non-tech and tech work
Start CMMC with Federal Bid Partners →
AI-powered application
CMMC Pulsar™ start-to-finish
$399
CMMC Pulsar logo
First-of-its-kind CMMC Pulsar™ app to run your CMMC workflow with AI assistance.
  • Structured checklist, AI guidance, and progress tracking
  • Build evidence and controls with clearer next-step workflows
  • Ideal for teams that want speed plus affordability
Open CMMC Pulsar™ →
Solicitation context: N6247026R0015. Requirements vary by acquisition and contract type; COTS-only exceptions may apply.

Market snapshot

Awarded-market signal for NAICS 237130 (last 12 months), benchmarked to sector 23.

12-month awarded value
$43,677,028
Sector total $33,350,364,963 • Share 0.1%
Live
Median
$624,065
P10–P90
$125,445$3,426,782
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.1%
share
Momentum (last 3 vs prior 3 buckets)
+100%($43,677,028)
Deal sizing
$624,065 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →

Description

READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY.

YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW:

Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil

Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.

AMENDMENT 0001

1. Revise the Solicitation
2. Add Site Visit Information
3. Add Award Fee Information and Award Fee CLIN
4. Answer PPIs

 

The Following Attachments were added:
Attachment N - Award Fee Plan
Attachment O - SECNAV 5512
Attachment P - BLANK DBIDS or VISITOR REQUEST
Attachment Q - Approved Identity Proofing Documents
Attachment R - Criteria for Denying Access to Navy Installations

AMENDMENT 0002

1. Revise the Solicitation
2. Answer PPIs

AMENDMENT 0003

1. Add revised Specification "01 30 00.00 22" attachment
2. Answer PPIs
3. Add Site Visit Sign-in Roster

AMENDMENT 0004

1. Revise the solicitation
2. Remove Project Labor Agreement Requirement (PLA)
3. Extend the proposal due date to 18 March 2026

THE PPI PERIOD IS NOT EXTENDED WITH THE SOLICITATION DUE DATE.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.