Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.
Solicitation from DEPT OF THE NAVY • DEPT OF DEFENSE. Place of performance: VA. Response deadline: Mar 18, 2026. Industry: NAICS 237130 • PSC Y1NZ.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 237130 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237130
Description
READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY.
YOU WILL NEED TO REQUEST THE SPECIFICATIONS VIA EMAIL AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW:
Daniel Rocha; daniel.r.rocha2.civ@us.navy.mil
Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.
AMENDMENT 0001
1. Revise the Solicitation
2. Add Site Visit Information
3. Add Award Fee Information and Award Fee CLIN
4. Answer PPIs
The Following Attachments were added:
Attachment N - Award Fee Plan
Attachment O - SECNAV 5512
Attachment P - BLANK DBIDS or VISITOR REQUEST
Attachment Q - Approved Identity Proofing Documents
Attachment R - Criteria for Denying Access to Navy Installations
AMENDMENT 0002
1. Revise the Solicitation
2. Answer PPIs
AMENDMENT 0003
1. Add revised Specification "01 30 00.00 22" attachment
2. Answer PPIs
3. Add Site Visit Sign-in Roster
AMENDMENT 0004
1. Revise the solicitation
2. Remove Project Labor Agreement Requirement (PLA)
3. Extend the proposal due date to 18 March 2026
THE PPI PERIOD IS NOT EXTENDED WITH THE SOLICITATION DUE DATE.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.