Skip to content
Department of Energy

TID QCM Accelerator

Solicitation: RFP_363235(MC)
Notice ID: 5941e2979c9948c783c391093924157f
TypeCombined Synopsis SolicitationNAICS 332710PSC5860DepartmentDepartment of EnergyStateCAPostedMar 06, 2026, 12:00 AM UTCDueMar 18, 2026, 12:00 AM UTCCloses in 11 days

Combined Synopsis Solicitation from ENERGY, DEPARTMENT OF • ENERGY, DEPARTMENT OF. Place of performance: CA. Response deadline: Mar 18, 2026. Industry: NAICS 332710 • PSC 5860.

Market snapshot

Awarded-market signal for NAICS 332710 (last 12 months), benchmarked to sector 33.

12-month awarded value
$1,850,705
Sector total $23,962,325,641 • Share 0.0%
Live
Median
$139,304
P10–P90
$95,823$182,785
Volatility
Moderate62%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($1,850,705)
Deal sizing
$139,304 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for CA
Live POP
Place of performance
Menlo Park, California • 94025 United States
State: CA
Contracting office
Menlo Park, CA • 94025 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
CA20260007 (Rev 3)
Match signal: state matchOpen WD
Published Jan 23, 2026California • Alpine, Amador, Butte +21
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1
Base $84.76Fringe $25.07
Rate
Area 2
Base $64.56Fringe $25.07
+247 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 247 more rate previews.
Davis-BaconBest fitstate match
CA20260007 (Rev 3)
Open WD
Published Jan 23, 2026California • Alpine, Amador, Butte +21
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1
Base $84.76Fringe $25.07
Rate
Area 2
Base $64.56Fringe $25.07
Rate
handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) AREA 1
Base $35.31Fringe $12.75
+246 more occupation rates in this WD
Davis-Baconstate match
CA20260001 (Rev 2)
Open WD
Published Jan 23, 2026California • San Diego
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+136 more occupation rates in this WD
Davis-Baconstate match
CA20260026 (Rev 2)
Open WD
Published Jan 23, 2026California • San Bernardino
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+129 more occupation rates in this WD
Davis-Baconstate match
CA20260024 (Rev 2)
Open WD
Published Jan 23, 2026California • Orange
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD

Point of Contact

Name
Marlene Curiel
Email
mcuriel@slac.stanford.edu
Phone
Not available

Agency & Office

Department
ENERGY, DEPARTMENT OF
Agency
ENERGY, DEPARTMENT OF
Subagency
SLAC Natl Accel Lab -DOE Contractor
Office
Not available
Contracting Office Address
Menlo Park, CA
94025 USA

More in NAICS 332710

Description

Combined Synopsis Solicitation from ENERGY, DEPARTMENT OF • ENERGY, DEPARTMENT OF. Place of performance: CA. Response deadline: Mar 18, 2026. Industry: NAICS 332710 • PSC 5860.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.