Construct New Bulkhead, Hugo Lake, Oklahoma

Solicitation: W912BV26RA011
Notice ID: 253a8a096d834111a6af7432bc6de3c3
TypePresolicitationNAICS 237990PSCZ2KASet-AsideNONEDepartmentDepartment of DefenseAgencyDept Of The ArmyStateOKPostedFeb 13, 2026, 12:00 AM UTCDueFeb 28, 2026, 08:00 AM UTCCloses in 6 days

Presolicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: OK. Response deadline: Feb 28, 2026. Industry: NAICS 237990 • PSC Z2KA.

Market snapshot

Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$1,287,533,718
Sector total $33,071,130,462 • Share 3.9%
Live
Median
$551,853
P10–P90
$43,045$119,860,900
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
3.9%
share
Momentum (last 3 vs prior 3 buckets)
+48369%($1,282,231,886)
Deal sizing
$551,853 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →

Description

1. Action Code: This is a Pre Solicitation notice.

2. Date: 1 February 2026

3. Contracting Office Address:
USACE CEST CT E
2488 E. 81st Street
Tulsa, Oklahoma 74137 4290

4. Product Service Code: Z2KA Repair or Alteration of Dams

5. Subject Title: Construct New Bulkhead, Hugo Lake, Oklahoma

7. Contact(s) Points:

Name               Caitlyn M. Cox                                                 Shawn G. Brady

Phone               N/A                                                                  918-669-4984

Email               caitlyn.m.cox@usace.army.mil                          shawn.g.brady@usace.army.mil

8. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by FAR 5.2- Synopsis of Proposed Contract Actions in preparation for release of the Request for Proposal (RFP) later date.

9. Description: The Request for Proposal for this project is expected to be issued on or about late February 2026. The North American Industry Classification System code is 237990 Other Heavy and Civil Engineering Construction, with a size standard of $45,000,000.00. The anticipated acquisition strategy is a Design Bid Build construction contract. The resulting contract is expected to be a Firm Fixed Price contract.

The U.S. Army Corps of Engineers, Tulsa District intends to solicit for construction services to provide a new segmental bulkhead assembly at Hugo Lake, Oklahoma.

Work includes fabrication, shipment, field assembly, testing of a segmental bulkhead assembly and incidental related construction, including construction of a crane pad. The bulkhead assembly will consist of six individual hollow steel tubular segments approximately 51 feet long that will be assembled in the reservoir to create a single floating bulkhead used to block water flow through the tainter gate bays during inspection and maintenance activities. The floating bulkhead will be ballasted with water using mechanical pumps and rotated to a vertical orientation for placement against the tainter gate piers.

The bulkhead may be assembled and disassembled in the water, and bulkhead segments may be removed and stored out of the water when not in service.

Optional Work: Removal and disposal of the existing bulkhead assembly.

The estimated magnitude of construction is between $5,000,000.00 and $10,000,000.00

10. Place of Contract Performance:

The preponderance of the work to be placed under this contract is expected to be performed at Hugo Lake, Oklahoma, with final delivery of bulkhead segments occurring within approximately five miles of 3107 US Hwy 70 E, Sawyer, Oklahoma 74756.

11. Set Aside Status: This is a Full and Open Competition

12. Additional Details: THIS SOLICITATION WILL BE OFFERED IN ELECTRONIC FORMAT ONLY. NO HARD COPIES WILL BE PROVIDED. Offerors can view and/or download the RFP and attachments at https://www.sam.gov when the RFP is posted. Interested parties can register under the Interested Vendors List at FBO. This will be the only method of amendment distribution; therefore, it is the OFFERORS’ RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Prospective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM in order to participate in this procurement.

13. Period of Performance (POP):

The Period of Performance will be identified in the solicitation.

14. Disclaimer:

No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 15, 2026
Executive summary

The U.S. Army Corps of Engineers (USACE) is preparing to solicit a contract for the construction of a new bulkhead at Hugo Lake, Oklahoma, as indicated in the presolicitation notice posted on February 1, 2026. The project is set under Product Service Code Z2KA and falls within the North American Industry Classification System code 237990, with an estimated construction range of $5,000,000 to $10,000,000. This contract will utilize a Design-Bid-Build strategy and will likely be a Firm Fixed Price contract.

What the buyer is trying to do

The buyer is seeking construction services to fabricate, assemble, and test a new floating bulkhead assembly, along with constructing a crane pad and optional removal of the existing bulkhead at Hugo Lake, Oklahoma.

Work breakdown
  • Fabrication of six hollow steel tubular segments
  • Shipment of bulkhead segments
  • Field assembly of the bulkhead in the reservoir
  • Testing of the segmental bulkhead assembly
  • Construction of a crane pad
  • Optional removal and disposal of existing bulkhead assembly
Response package checklist
  • Understanding of the Design-Bid-Build process
  • Evidence of past performance on similar projects
  • Comprehensive construction plan including timeline
  • Safety and quality control plans
  • Cost proposal within the $5,000,000 to $10,000,000 range
Suggested keywords
bulkhead constructionHugo Lake projectUSACE constructionDesign-Bid-Buildfirm fixed price
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed timeline for construction phases
  • Exact date for the RFP release
  • Further specifics regarding environmental regulations
  • Information on existing bulkhead condition for removal

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.