Skip to content
Department of Defense

Construct New Bulkhead, Hugo Lake, Oklahoma

Solicitation: W912BV26RA011
Notice ID: 253a8a096d834111a6af7432bc6de3c3
TypePresolicitationNAICS 237990PSCZ2KASet-AsideNONEDepartmentDepartment of DefenseAgencyDept Of The ArmyStateOKPostedFeb 13, 2026, 12:00 AM UTCDueFeb 28, 2026, 08:00 AM UTCExpired

Presolicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: OK. Response deadline: Feb 28, 2026. Industry: NAICS 237990 • PSC Z2KA.

DoD CMMC Readiness
Modern compliance support by Federal Bid Partners

CMMC support options for this DoD solicitation

As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.

Done-for-you service
CMMC start-to-finish with FBP
$2,000
Registered Practitioner logo
Guided by a Registered Practitioner with practical DoD workflow support.
  • Gap review, remediation roadmap, and implementation support
  • Policy package, evidence mapping, and submission prep
  • Designed for primes and subs across non-tech and tech work
Start CMMC with Federal Bid Partners →
AI-powered application
CMMC Pulsar™ start-to-finish
$399
CMMC Pulsar logo
First-of-its-kind CMMC Pulsar™ app to run your CMMC workflow with AI assistance.
  • Structured checklist, AI guidance, and progress tracking
  • Build evidence and controls with clearer next-step workflows
  • Ideal for teams that want speed plus affordability
Open CMMC Pulsar™ →
Solicitation context: W912BV26RA011. Requirements vary by acquisition and contract type; COTS-only exceptions may apply.

Market snapshot

Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$1,713,255,878
Sector total $37,281,242,776 • Share 4.6%
Live
Median
$2,448,427
P10–P90
$978,307$16,039,702
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
4.6%
share
Momentum (last 3 vs prior 3 buckets)
+116%($627,235,191)
Deal sizing
$2,448,427 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for OK
Live POP
Place of performance
Not listed
State: OK
Contracting office
Tulsa, OK • 74137-4290 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OK20260041 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oklahoma • Canadian
Rate
BRICKLAYER
Base $26.92Fringe $13.09
Rate
MILLWRIGHT
Base $32.75Fringe $11.91
+40 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 40 more rate previews.
Davis-BaconBest fitstate match
OK20260041 (Rev 1)
Open WD
Published Jan 23, 2026Oklahoma • Canadian
Rate
BRICKLAYER
Base $26.92Fringe $13.09
Rate
MILLWRIGHT
Base $32.75Fringe $11.91
Rate
CARPENTER (Form Work Only)
Base $27.79Fringe $10.05
+39 more occupation rates in this WD
Davis-Baconstate match
OK20260048 (Rev 1)
Open WD
Published Jan 23, 2026Oklahoma • McClain
Rate
BRICKLAYER
Base $26.92Fringe $13.09
Rate
MILLWRIGHT
Base $32.75Fringe $11.91
Rate
CARPENTER (Form Work Only)
Base $27.79Fringe $10.05
+38 more occupation rates in this WD
Davis-Baconstate match
OK20260046 (Rev 1)
Open WD
Published Jan 23, 2026Oklahoma • Lincoln
Rate
BRICKLAYER
Base $26.92Fringe $13.09
Rate
MILLWRIGHT
Base $32.75Fringe $11.91
Rate
CARPENTER (Form Work Only)
Base $27.79Fringe $10.05
+38 more occupation rates in this WD
Davis-Baconstate match
OK20260054 (Rev 1)
Open WD
Published Jan 23, 2026Oklahoma • Le Flore, Sequoyah
Rate
BRICKLAYER
Base $26.92Fringe $13.09
Rate
ELECTRICIAN
Base $30.03Fringe $14.03
Rate
POWER EQUIPMENT OPERATOR: Group 1
Base $38.09Fringe $19.05
+23 more occupation rates in this WD

Point of Contact

Name
CAITLYN COX
Email
caitlyn.m.cox@usace.army.mil
Phone
9186694951
Name
Shawn Brady
Email
shawn.brady@usace.army.mil
Phone
9186694984

Agency & Office

Department
DEPT OF DEFENSE
Agency
DEPT OF THE ARMY
Subagency
US ARMY CORPS OF ENGINEERS
Office
ENGINEER DIVISION SOUTHWESTERN • ENDIST TULSA • W076 ENDIST TULSA
Contracting Office Address
Tulsa, OK
74137-4290 USA

More in NAICS 237990

Description

1. Action Code: This is a Pre Solicitation notice.

2. Date: 1 February 2026

3. Contracting Office Address:
USACE CEST CT E
2488 E. 81st Street
Tulsa, Oklahoma 74137 4290

4. Product Service Code: Z2KA Repair or Alteration of Dams

5. Subject Title: Construct New Bulkhead, Hugo Lake, Oklahoma

7. Contact(s) Points:

Name               Caitlyn M. Cox                                                 Shawn G. Brady

Phone               N/A                                                                  918-669-4984

Email               caitlyn.m.cox@usace.army.mil                          shawn.g.brady@usace.army.mil

8. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by FAR 5.2- Synopsis of Proposed Contract Actions in preparation for release of the Request for Proposal (RFP) later date.

9. Description: The Request for Proposal for this project is expected to be issued on or about late February 2026. The North American Industry Classification System code is 237990 Other Heavy and Civil Engineering Construction, with a size standard of $45,000,000.00. The anticipated acquisition strategy is a Design Bid Build construction contract. The resulting contract is expected to be a Firm Fixed Price contract.

The U.S. Army Corps of Engineers, Tulsa District intends to solicit for construction services to provide a new segmental bulkhead assembly at Hugo Lake, Oklahoma.

Work includes fabrication, shipment, field assembly, testing of a segmental bulkhead assembly and incidental related construction, including construction of a crane pad. The bulkhead assembly will consist of six individual hollow steel tubular segments approximately 51 feet long that will be assembled in the reservoir to create a single floating bulkhead used to block water flow through the tainter gate bays during inspection and maintenance activities. The floating bulkhead will be ballasted with water using mechanical pumps and rotated to a vertical orientation for placement against the tainter gate piers.

The bulkhead may be assembled and disassembled in the water, and bulkhead segments may be removed and stored out of the water when not in service.

Optional Work: Removal and disposal of the existing bulkhead assembly.

The estimated magnitude of construction is between $5,000,000.00 and $10,000,000.00

10. Place of Contract Performance:

The preponderance of the work to be placed under this contract is expected to be performed at Hugo Lake, Oklahoma, with final delivery of bulkhead segments occurring within approximately five miles of 3107 US Hwy 70 E, Sawyer, Oklahoma 74756.

11. Set Aside Status: This is a Full and Open Competition

12. Additional Details: THIS SOLICITATION WILL BE OFFERED IN ELECTRONIC FORMAT ONLY. NO HARD COPIES WILL BE PROVIDED. Offerors can view and/or download the RFP and attachments at https://www.sam.gov when the RFP is posted. Interested parties can register under the Interested Vendors List at FBO. This will be the only method of amendment distribution; therefore, it is the OFFERORS’ RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Prospective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM in order to participate in this procurement.

13. Period of Performance (POP):

The Period of Performance will be identified in the solicitation.

14. Disclaimer:

No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 15, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The U.S. Army Corps of Engineers (USACE) is preparing to solicit a contract for the construction of a new bulkhead at Hugo Lake, Oklahoma, as indicated in the presolicitation notice posted on February 1, 2026. The project is set under Product Service Code Z2KA and falls within the North American Industry Classification System code 237990, with an estimated construction range of $5,000,000 to $10,000,000. This contract will utilize a Design-Bid-Build strategy and will likely be a Firm Fixed Price contract.

bulkhead constructionHugo Lake projectUSACE constructionDesign-Bid-Buildfirm fixed price
What the buyer is trying to do

The buyer is seeking construction services to fabricate, assemble, and test a new floating bulkhead assembly, along with constructing a crane pad and optional removal of the existing bulkhead at Hugo Lake, Oklahoma.

Who should pursue this
  • Construction firms specializing in heavy civil engineering
  • Companies with experience in water-related construction projects
  • Contractors familiar with USACE contracting requirements
Work breakdown
  • Fabrication of six hollow steel tubular segments
  • Shipment of bulkhead segments
  • Field assembly of the bulkhead in the reservoir
  • Testing of the segmental bulkhead assembly
  • Construction of a crane pad
  • Optional removal and disposal of existing bulkhead assembly
Response package checklist
  • Understanding of the Design-Bid-Build process
  • Evidence of past performance on similar projects
  • Comprehensive construction plan including timeline
  • Safety and quality control plans
  • Cost proposal within the $5,000,000 to $10,000,000 range
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must be registered with the System for Award Management (SAM)
  • Adherence to FAR 5.2 requirements for presolicitation notices
  • Compliance with local regulations and environmental standards
Pricing strategy
  • Firm Fixed Price proposal based on project requirements
  • Detailed cost breakdown required for all phases of the project
  • Consideration of optional work costs in total bid
Teaming and subs
  • Potential partnership with fabrication specialists for bulkhead segments
  • Engagement of subcontractors with crane operation experience
  • Collaboration with environmental consultants for compliance
Risks and watchouts
  • Delays in fabrication or shipment affecting project timeline
  • Risks related to water conditions during assembly
  • Regulatory changes impacting construction requirements
  • Potential cost overruns due to design modifications
Smart questions to ask
  • What are the specific testing procedures for the bulkhead assembly?
  • Are there any known environmental considerations for the construction site?
  • What is the expected timeline for the release of the formal RFP?
  • Are there existing site plans or studies provided by the Army Corps?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed timeline for construction phases
  • Exact date for the RFP release
  • Further specifics regarding environmental regulations
  • Information on existing bulkhead condition for removal

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.