Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

135 records • Page 1 of 6
DBA
76
SCA
21
CBA
38
Active
135
With Rates
96
With Benefits
21
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 23, 2026
Oklahoma • Logan
ELEVATOR MECHANIC
$53.40 + $39.52 fringe
ELECTRICIAN
$41.40 + $17.25 fringe
PLUMBER (Excludes HVAC Pipe and Unit Installation)
$41.00 + $16.03 fringe
Published Jan 23, 2026
Oklahoma • Lincoln
ELEVATOR MECHANIC
$53.40 + $39.52 fringe
ELECTRICIAN
$41.40 + $17.25 fringe
PLUMBER (Excludes HVAC Pipe and Unit Installation)
$41.00 + $16.03 fringe
Published Jan 23, 2026
Oklahoma • Cleveland
ELEVATOR MECHANIC
$53.40 + $39.52 fringe
PLUMBER (Excludes HVAC Pipe and Unit Installation)
$41.00 + $16.03 fringe
PIPEFITTER (Including HVAC Pipe Installation, excluding HVAC Unit Installation)
$41.00 + $16.03 fringe
Published Jan 23, 2026
Oklahoma • Oklahoma
ELEVATOR MECHANIC
$53.40 + $39.52 fringe
ELECTRICIAN (Excludes Low Voltage Wiring and Installation of Alarms)
$41.40 + $17.25 fringe
PLUMBER (Excludes HVAC Pipe Installation)
$41.00 + $16.03 fringe
Published Jan 23, 2026
Oklahoma • McClain
ELEVATOR MECHANIC
$53.40 + $39.52 fringe
ELECTRICIAN
$41.40 + $17.25 fringe
PLUMBER (Excludes HVAC Pipe and Unit Installation)
$41.00 + $16.03 fringe
Published Jan 23, 2026
Oklahoma • Canadian
ELEVATOR MECHANIC
$53.40 + $39.52 fringe
ELECTRICIAN
$41.40 + $17.25 fringe
PIPEFITTER (Excludes HVAC Unit Installation)
$41.00 + $16.03 fringe
Published Jan 23, 2026
Oklahoma • Grady
ELEVATOR MECHANIC
$53.40 + $39.52 fringe
ELECTRICIAN
$41.40 + $17.25 fringe
PLUMBER (Excludes HVAC Pipe Installation)
$41.00 + $16.03 fringe
Published Jan 23, 2026
Oklahoma • Le Flore, Sequoyah
POWER EQUIPMENT OPERATOR: Group 1
$38.09 + $19.05 fringe
PLUMBER
$36.65 + $16.48 fringe
PIPEFITTER
$36.65 + $16.03 fringe
Published Jan 02, 2026
Oklahoma • Adair, Cherokee
ELEVATOR MECHANIC
$51.24 + $38.43 fringe
SPRINKLER FITTER (Fire Sprinklers)
$39.95 + $0.38 fringe
POWER EQUIPMENT OPERATOR: Group 1
$38.09 + $19.05 fringe
Published Jan 02, 2026
Oklahoma • Garfield
PLUMBER (Excludes HVAC Pipe Installation)
$41.00 + $16.03 fringe
PIPEFITTER (HVAC Pipe Installation Only)
$41.00 + $16.03 fringe
POWER EQUIPMENT OPERATOR: Group 1
$38.09 + $19.05 fringe
Published Jan 02, 2026
Oklahoma • Rogers
ELEVATOR MECHANIC
$51.24 + $38.43 fringe
POWER EQUIPMENT OPERATOR: Group 1
$38.09 + $19.05 fringe
PLUMBER (Excludes HVAC Pipe and Unit Installation)
$36.65 + $16.03 fringe
Published Jan 02, 2026
Oklahoma • Murray
ELECTRICIAN
$41.40 + $17.25 fringe
PLUMBER (Excludes HVAC Pipe Installation)
$41.00 + $16.03 fringe
PIPEFITTER (Including installation of HVAC Electrical/Temperature Controls and HVAC Pipe Installation)
$41.00 + $16.03 fringe
Published Jan 02, 2026
Oklahoma • Muskogee
ELEVATOR MECHANIC
$51.24 + $38.43 fringe
SPRINKLER FITTER (Fire Sprinklers)
$39.95 + $0.38 fringe
POWER EQUIPMENT OPERATOR: Group 1
$38.09 + $19.05 fringe
Published Jan 02, 2026
Oklahoma • Greer, Harmon, Jackson +2
BRICKLAYER
$8.50 + $0.00 fringe
Sheet metal worker
$7.85 + $0.00 fringe
FLOOR LAYER: Carpet
$7.50 + $0.00 fringe
Published Jan 02, 2026
Oklahoma • Carter
PIPEFITTER (Including installation of HVAC Electrical/Temperature Controls and HVAC Pipe Installation)
$41.00 + $16.03 fringe
POWER EQUIPMENT OPERATOR: Group 1
$38.09 + $19.05 fringe
Group 2
$36.14 + $19.05 fringe
Published Jan 02, 2026
Oklahoma • Mayes
ELEVATOR MECHANIC
$51.24 + $38.43 fringe
SPRINKLER FITTER (Fire Sprinklers)
$39.95 + $0.38 fringe
POWER EQUIPMENT OPERATOR: Group 1
$38.09 + $19.05 fringe
Published Jan 02, 2026
Oklahoma • Le Flore, Sequoyah
Traffic signal installer
$18.04 + $0.00 fringe
Grader/Blade
$16.95 + $0.00 fringe
Backhoe/Trackhoe
$15.83 + $0.00 fringe
Published Jan 02, 2026
Oklahoma • Woods
ELECTRICIAN
$41.40 + $17.25 fringe
PLUMBER (Excludes HVAC Pipe Installation)
$41.00 + $16.03 fringe
PIPEFITTER (HVAC Pipe Installation Only)
$41.00 + $16.03 fringe
Published Jan 02, 2026
Oklahoma • Creek, Okmulgee, Osage +4
Traffic signal installer
$18.04 + $0.00 fringe
Tulsa County
$18.01 + $0.00 fringe
Crane
$17.45 + $0.00 fringe
Published Jan 02, 2026
Oklahoma • Comanche
POWER EQUIPMENT OPERATOR: Group 1
$38.09 + $19.05 fringe
Group 2
$36.14 + $19.05 fringe
Group 3
$35.40 + $19.05 fringe
Published Jan 02, 2026
Oklahoma • Adair, Cherokee, Craig +8
Mechanic Muskogee County
$18.96 + $0.00 fringe
Grader/Blade
$16.47 + $0.00 fringe
Flatbed Truck
$16.18 + $0.00 fringe
Published Jan 02, 2026
Oklahoma • Atoka, Bryan, Carter +16
Mechanic
$17.37 + $0.00 fringe
Grader/Blade
$17.04 + $0.00 fringe
Tandem Axle/Semi Trailer Carter County
$16.61 + $0.00 fringe
Published Jan 02, 2026
Oklahoma • Beckham, Caddo, Cotton +10
POWER EQUIPMENT OPERATOR: Group 1
$38.09 + $19.05 fringe
Group 2
$36.14 + $19.05 fringe
Group 3
$35.40 + $19.05 fringe
Published Jan 02, 2026
Oklahoma • Coal, Garvin, Haskell +9
ELECTRICIAN
$41.40 + $17.25 fringe
PIPEFITTER (Including Installation of HVAC Electrical/Temperature Controls and HVAC Pipe Installation)
$41.00 + $16.03 fringe
PLUMBER (Excludes HVAC Pipe Installation)
$41.00 + $16.03 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.