Skip to content
Davis-Bacon

OK20260015 (Rev 0)

Coverage: Oklahoma • Oklahoma.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
Traffic signal installer$17.37$0.00
Includes Form Work)$12.78$0.00
IRONWORKER, REINFORCING$13.00$0.00
STRUCTURAL$14.21$0.00
Common or General$10.64$0.00
Pipelayer$12.84$0.00
Traffic Control (Includes Flagger, Setting Up and Moving Cones/Barrels)$11.69$0.00
Asphalt Paver Screed$12.44$0.00
Backhoe/Trackhoe$13.78$0.00
Broom$11.97$0.00
Concrete Paving Machine$13.61$0.00
Crane$17.03$0.00
Excavator$15.85$0.00
Loader (Front End)$12.95$0.00
Milling Machine$14.62$0.00
Oiler$14.06$0.00
Asphalt)$13.02$0.00
Dirt Compaction)$12.36$0.00
Striping Machine$12.56$0.00
Trencher$13.66$0.00
Flatbed Truck$14.69$0.00
Off the Road Truck$14.39$0.00
Tandem Axle/Semi Trailer$14.64$0.00

Related Wage Determinations

View directory →