Davis-Bacon
OK20260054 (Rev 1)
Coverage: Oklahoma • Le Flore, Sequoyah.
Published: Jan 23, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BRICKLAYER | $26.92 | $13.09 |
| ELECTRICIAN | $30.03 | $14.03 |
| POWER EQUIPMENT OPERATOR: Group 1 | $38.09 | $19.05 |
| Group 2 | $36.14 | $19.05 |
| Group 3 | $35.40 | $19.05 |
| Group 4 | $34.07 | $19.05 |
| Group 8 | $28.77 | $19.05 |
| Group10 | $27.25 | $19.05 |
| IRONWORKER (Ornamental, Reinforcing and Structural) | $30.35 | $16.83 |
| PLUMBER | $36.65 | $16.48 |
| PIPEFITTER | $36.65 | $16.03 |
| ROOFER | $26.30 | $10.34 |
| SHEET METAL WORKER (HVAC Duct Installation Only) | $35.49 | $14.60 |
| CARPENTER | $15.86 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $14.26 | $1.27 |
| LABORER: Common or General | $9.63 | $0.00 |
| LABORER: Mason Tender - Brick | $12.52 | $0.00 |
| LABORER: Mason Tender - Cement/Concrete | $13.00 | $1.91 |
| LABORER: Pipelayer | $12.39 | $0.00 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $17.38 | $4.08 |
| OPERATOR: Bulldozer | $20.64 | $2.35 |
| OPERATOR: Grader/Blade | $14.28 | $1.70 |
| OPERATOR: Loader (Front End) | $16.18 | $0.00 |
| PAINTER: Brush, Roller and Spray | $12.22 | $0.00 |
| SHEET METAL WORKER, Excludes HVAC Duct Installation | $22.18 | $5.06 |
| TRUCK DRIVER: Dump and Flatbed Truck | $11.00 | $0.00 |