King Air 360ER Full Flight Simulator – Purchase, Install, and Support
UPDATE 02 Released 4/9/2026 Part 2 of 2 Q&A is nearing completion. Offerors should expect release of this sometime tommorow. At this time, the soliciation…
Federal Aviation Administration opportunities often flow through multiple subagencies and contracting offices, each with different templates and amendment behavior. Use this hub to keep that activity in one place before final submission checks on SAM.gov.
Follow how Federal Aviation Administration is awarding work, which codes recur most often, and which subagencies or states are showing the strongest live signal on this hub.
UPDATE 02 Released 4/9/2026 Part 2 of 2 Q&A is nearing completion. Offerors should expect release of this sometime tommorow. At this time, the soliciation…
1. Introduction and Purpose The Federal Aviation Administration (FAA) has a requirement for the procurement of Miniature Uninterruptible Power Supplies (mUPS).…
The Federal Aviation Administration (FAA), Terminal Acquisition Branch, is seeking qualified General Contractors interested in submitting a proposal for the…
The Federal Aviation Administration (FAA), Terminal Acquisition Branch, is seeking qualified General Contractors interested in submitting a proposal for the…
Annoucement was amended to correct item #18 to state: 18. What impact, if any are you experiencing with respect to upcoming or expected projects? Annoucement…
The FAA has a need for: (1) One Part Number BOSS70-004 - EBOSS 70-45 HYBRID DUAL AXLE ELEC TRAILER 2-5/16" BALL HITCH ASSEMBLY. This asset will need to have…
Mechanical Install (3) indoor wall-mounted units, along with all refrigerant and drain piping. Install (1) 6-ton heat pump. Unit to be anchored to exterior…
This is a Sources Sought notice to obtain information regarding the availability and capability of all qualified sources to fulfill a potential requirement for…
MARKET SURVEY FOR TROLL BRANDED EQUIPMENT FOR SPARES AND REPAIRS CONTRACT. THIS IS A FEDERAL AVIATION ADMINISTRATION LOGITSICS CENTER REQUIREMENT. THIS PRODUCT…
UPDATE 01 Released: 4/6/2026 Part 1 of 2 Q&A is provided (see in list of attachments). The soliciation closing date is hereby extended to 4/15/2026. (end of…
The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached…
The Federal Aviation Administration (FAA) has a requirement for the acquisition of the repair of the tower elevator system located at ASDE Remote Tower (FAA)…
MARKET SURVEY for the Procurement of Critical Incident Response Initial Training (CIRP) NO PHONE CALLS PLEASE. ALL QUESTIONS AND SUBMISSIONS MUST BE IN WRITING…
Annoucement was amended to correctly number the items listed below Market Survey: The FAA is seeking interested Contractors that have the capability to design…
The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached…
**THIS IS NOT A SCREENING INFORMATION REQUEST** ***DRAFT*** The Facilities and Engineering Services (AJW-2) directorate is a part of the Air Traffic…
The Federal Aviation Administration is conducting a Market Survey to improve the Government's understanding of the current marketplace and to identify capable…
Mechanical Install (3) indoor wall-mounted units, along with all refrigerant and drain piping. Install (1) 6-ton heat pump. Unit to be anchored to exterior…
13 notices close in the next 14 days on this page. Frequent issuing offices include 697DCK REGIONAL ACQUISITIONS SVCS, 6973GH FRANCHISE ACQUISITION SVCS, and 693KA9 CONTRACTING FOR SERVICES.
Browse common filters found across the opportunities listed on this page.