Skip to content
Department of Homeland Security

VALVE,VACUUM REGULA

Solicitation: 70Z08526Q40131B00
Notice ID: f7e010d03a994af4917d0c53d0b4ee30
TypeSolicitationNAICS 333618PSC4820Set-AsideSBADepartmentDepartment of Homeland SecurityAgencyUs Coast GuardStateCAPostedApr 09, 2026, 12:00 AM UTCDueApr 23, 2026, 04:00 PM UTCCloses in 14 days

Solicitation from US COAST GUARD • HOMELAND SECURITY, DEPARTMENT OF. Place of performance: CA. Response deadline: Apr 23, 2026. Industry: NAICS 333618 • PSC 4820.

Market snapshot

Awarded-market signal for NAICS 333618 (last 12 months), benchmarked to sector 33.

12-month awarded value
$135,719,474
Sector total $52,169,347,256 • Share 0.3%
Live
Median
$258,768
P10–P90
$29,394$350,000
Volatility
Volatile124%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.3%
share
Momentum (last 3 vs prior 3 buckets)
+300%($81,456,012)
Deal sizing
$258,768 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for CA
Live POP
Place of performance
Not listed
State: CA
Contracting office
Alameda, CA • 94501 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
CA20260007 (Rev 3)
Match signal: state matchOpen WD
Published Jan 23, 2026California • Alpine, Amador, Butte +21
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1
Base $84.76Fringe $25.07
Rate
Area 2
Base $64.56Fringe $25.07
+247 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 247 more rate previews.
Davis-BaconBest fitstate match
CA20260007 (Rev 3)
Open WD
Published Jan 23, 2026California • Alpine, Amador, Butte +21
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1
Base $84.76Fringe $25.07
Rate
Area 2
Base $64.56Fringe $25.07
Rate
handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) AREA 1
Base $35.31Fringe $12.75
+246 more occupation rates in this WD
Davis-Baconstate match
CA20260026 (Rev 2)
Open WD
Published Jan 23, 2026California • San Bernardino
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+129 more occupation rates in this WD
Davis-Baconstate match
CA20260012 (Rev 2)
Open WD
Published Jan 23, 2026California • San Luis Obispo
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+128 more occupation rates in this WD
Davis-Baconstate match
CA20260015 (Rev 2)
Open WD
Published Jan 23, 2026California • Ventura
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD

Point of Contact

Name
Stephanie Garity
Email
stephanie.a.garity@uscg.mil
Phone
4107626496
Name
Chad Ball
Email
chad.a.ball@uscg.mil
Phone
5716072534

Agency & Office

Department
HOMELAND SECURITY, DEPARTMENT OF
Agency
US COAST GUARD
Subagency
SFLC PROCUREMENT BRANCH 2(00085)
Office
Not available
Contracting Office Address
Alameda, CA
94501 USA

More in NAICS 333618

Description

see attached

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.