Helena-Lewis and Clark National Forest Gipsy Lake Day Use Improvements
Combined Synopsis Solicitation from FOREST SERVICE • AGRICULTURE, DEPARTMENT OF. Place of performance: MT. Response deadline: Mar 06, 2026. Industry: NAICS 237990 • PSC Y1LB.
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237990
Description
Description:
This project consists of constructing new parking and living areas at the Gipsy Lake Day Use site on the Townsend Ranger District. Construction of each new site will require excavation and grading work that will balance cut and fill for a natural fit into the landscape. Each site will include all new furnishings as shown in the drawings.
BASE BID – SITE 1
Construct a double wide parking area with two living areas.
Remove 4 large trees. Lop and scatter as shown on drawings for erosion control.
OPTION 01 – SITE 2
Construct a single wide parking area with one living area.
Install 2 new culverts.
Construct a new ditch.
OPTION 02 – SITE 3
Construct a single wide parking area with one living area.
Install barrier rocks (government furnished).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.