Skip to content
Department of Defense

Alvin Bush Dam Rock Wall Stabilization, Kettle Creek, Clinton County, PA

Solicitation: W912DR26BA002
Notice ID: dcccbc15f3e44c23b6e8e63998a27bb1
TypeSolicitationNAICS 237990PSCY1PZDepartmentDepartment of DefenseAgencyDept Of The ArmyStatePAPostedFeb 12, 2026, 12:00 AM UTCDueApr 23, 2026, 03:00 PM UTCCloses in 59 days

Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: PA. Response deadline: Apr 23, 2026. Industry: NAICS 237990 • PSC Y1PZ.

Market snapshot

Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$1,287,533,718
Sector total $33,095,080,127 • Share 3.9%
Live
Median
$551,853
P10–P90
$43,045$119,860,900
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
3.9%
share
Momentum (last 3 vs prior 3 buckets)
+48369%($1,282,231,886)
Deal sizing
$551,853 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for PA
Live POP
Place of performance
Albin Bush DamKettle Creek, Clinton County, PA • 17764
State: PA
Contracting office
Baltimore, MD • 21201-2526 USA

Point of Contact

Name
Clark Miller
Email
clark.b.miller@usace.army.mil
Phone
4109625679

Agency & Office

Department
DEPT OF DEFENSE
Agency
DEPT OF THE ARMY
Subagency
US ARMY CORPS OF ENGINEERS
Office
ENGINEER DIVISION NORTH ATLANTIC • ENDIST BALTIMORE • W2SD ENDIST BALTIMORE
Contracting Office Address
Baltimore, MD
21201-2526 USA

More in NAICS 237990

Description

Alvin Bush Dam Rock Wall StabilizationThe U.S. Army Corps of Engineers (USACE) Baltimore District is procuring a single award contract for a design-bid-build firm-fixed-price contract using the procedures of FAR 14 and 36. The magnitude of construction is between Between $25,000,000 and $100,000,000. Related Notices: W912DR25X13XJProject Scope:1. Alvin Bush Dam has a roadway alongside its spillway. The primary features of the dam include an earthen embankment; an uncontrolled spillway with concrete weir; and a gated outlet consisting of a control tower and concrete lined tunnel through bedrock. The wall is approaching 62 years old, is deteriorated, and has nearly eroded back to the state roadway.2. The scope of the project consists of constructing two reinforced concrete rock anchored walls to prevent continued progressive rock erosion which has led to fallen rock accumulation within the spillway and will ultimately lead to failure of Kettle Creek Road. The project also includes proposed drainage improvements, paving, grading, spoils, access roads, stairs, railing, fencing and other work incidental to the related work.3. Obtain the necessary permits to perform the work cited above. As a minimum, a permit from the Pennsylvania Department of Environmental Protection National Pollution will be required.Please see attachments for complete details.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.