Sources Sought for Missouri River Navigation Obstruction Removal
Sources Sought from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: Franklin County, Missouri, River Miles 90-91. Response deadline: Jan 20, 2026. Industry: NAICS 237990.
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237990
Description
https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=da3f5413ebe44893b7ed131491f3903a
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This sources sought notice by the U.S. Army Corps of Engineers seeks information from interested sources for the removal of navigation obstructions in the Missouri River. The project falls under NAICS 237990 - Other Heavy and Civil Engineering Construction. Responses are due by January 20, 2026, and will assist the agency in assessing the market to inform potential future solicitations.
The agency is looking to identify contractors with the capability to remove obstructions from the Missouri River to ensure safe navigation and maintain waterway infrastructure.
- Identify contractors with experience in navigation obstruction removal
- Assess capabilities in heavy construction and civil engineering
- Gather information about previous performance on similar projects
- Evaluate safety protocols and environmental compliance
- Understand resources available for river navigation projects
- Business size classification and capabilities statement
- Relevant project experience summaries
- References from previous clients in similar work
- Staff qualifications and safety records
- Approach to environmental compliance
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific types of navigation obstructions to be addressed
- Detailed project scope and performance requirements
- Any local regulatory considerations affecting work
- Projected budget range for the project
- Contact information for project stakeholders
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.