- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Replace Fire Alarm Control Panel - Naval Station Everett, WA
Sources Sought from DEPT OF THE NAVY • DEPT OF DEFENSE. Place of performance: WA. Response deadline: Jan 21, 2026. Industry: NAICS 236220 • PSC Z2FB.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS 236220
Description
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves replacing the fire alarm control panel at Naval Station Everett, WA, under a Sources Sought notice issued by the Department of the Navy. This is an SBA set-aside, encouraging small businesses to participate. The solicitation is focused on gathering information to identify qualified vendors capable of delivering the project requirements.
The buyer aims to assess potential vendors who can meet the requirements for replacing the fire alarm control panel, ensuring safety and compliance with federal regulations.
- Site evaluation and assessment of current fire alarm systems
- Design and engineering of the new fire alarm control panel
- Procurement of materials and equipment
- Installation of the new fire alarm control panel
- Testing and commissioning of the system
- Training for facility personnel on the new system
- Documentation of the installation and operational procedures
- Company's capability statement
- Experience with similar projects
- Project team qualifications and certifications
- Safety and compliance certifications
- Past performance references
- Response to specific questions in the Sources Sought notice
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications for the fire alarm control panel
- Existing system's performance issues or limitations
- Access restrictions at the site during installation
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.