- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Temp Chiller Rental
Presolicitation from DEPT OF THE NAVY • DEPT OF DEFENSE. Place of performance: SC. Response deadline: Apr 15, 2026. Industry: NAICS 532490 • PSC W035.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 532490 (last 12 months), benchmarked to sector 53.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 20 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 532490
Description
Chill Water Unit shall be a minimum 150 Ton Capacity Chiller.
Must be air-cooled.
Must be operable on a single 460/480 (V), 400 Amp Breaker (MAXIMUM).
Must be provided with a male 500 mcm Camlock electrical connection.
Single Circulating pump (minimum).
CRITICAL SYSTEM SUPPORT: Unit must be capable of operating twenty-four (24) hours a day, seven (7) days a Week.
At a minimum, the pumping system shall be capable of providing 450 GPM at 300 feet of head pressure. Supplemental pumps may be provided if needed to meet required pressure/flow rates, but a pump integral to the chiller unit would be preferred.
Unit must have two (2) each inlets. Inlets must be 2-1/2” Male NPT. All inlet connections shall have isolation globe valves installed.
Unit must have two (2) each outlets. Outlets must be 2-1/2” Male NPT. All outlet connections shall have isolation globe valves installed.
The gross weight of the unit shall be clearly marked on the outside of the unit as outlined in Paragraph 11. If the unit is not a complete unit, the gross weight of each component shall be clearly marked on each component.
Unit must be free standing and have forklift slots (capable of being moved with a forklift). If the unit is not a complete unit, each component shall be capable of being moved with a forklift as well.
Chiller Unit to be equipped with operational Inlet and Outlet Pressure Gages. Pressure gages are to be located on the contractor provided supply and discharge manifolds.
Unit shall have an electronic monitoring system that monitors inlet and outlet temperatures and flow rates.
Desired output water temperature range is 45° F - 55° F.
Evaporator must be capable of delivering a leaving temperature of less than 45 °F.
Condenser must be capable of operating in a wide ambient temperature range (0-125 °F).
Shown in figure below, Contractor is to provide all equipment from the return manifold to the supply manifold. System shall be a complete unit. If pump is separate, vendor will provide and install all piping/valves/fittings as required to couple pump to the Chill Water Unit. Vendor is to provide extra fittings and hoses to support installation, as required. If the system requires assembly, the system shall be assembled in such a way that it does not cause tripping hazards by minimizing the lengths of hoses between components. If lengths of hoses are longer than needed, it should be able to be coiled and put somewhere out of the way of normal foot traffic. Hoses shall be routed in a way that does not cause the hose to kink and reduce flowrate.
If chiller system holds 55 gallons or more of fuel or oil or similar fluid, provide an environmental catch tank capable of holding at least 110% of the capacity of the fuel, oil and other fluids required to operate the rental unit.
Unit must be affixed with a metal tag designating the supplying company, a POC responsible for repairs and maintenance, and a phone number for the POC who is responsible for repairs and maintenance.
Contractor must provide instruction manual and training as requested.
Contractor provided equipment (i.e. hoses, manifolds, etc.) shall have insulation installed around them to reduce temperature losses in the Chill Water System.
Interested vendors should notify contract speicialist of their interest
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.