- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Fort Peck Excitation System Upgrade
Sources Sought from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: MT. Response deadline: Apr 07, 2026. Industry: NAICS 335311 • PSC Z2KA.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 335311 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 22 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 335311
Description
****** Update: 03/23/2026 NAICS Code Updated to 335311 and proposal due date extended to 07 April 2026 ******
Background
USACE is seeking information from interested and qualified contractors regarding potential modernization of excitation systems at Fort Peck Dam, a remote hydroelectric facility located on the Missouri River near Glasgow, Montana. The facility consists of two powerhouses with a total of five generating units. Existing excitation systems present reliability and supportability concerns due to aging equipment, partial legacy upgrades, and obsolescence of key control components.
Powerhouse 1 – Units 1–3
- Existing digital excitation regulator hardware remains serviceable.
- Front-end excitation controls, field breakers, and operator interface components are obsolete and/or experiencing reliability issues.
- The Government is evaluating a targeted excitation system modernization approach, which may include replacement of failing or obsolete front-end components while reusing existing regulator hardware and cubicles, with modifications as required.
Powerhouse 2 – Units 4–5
- Existing excitation systems include legacy components operating beyond their recommended design life.
- The Government is evaluating a full excitation system replacement for these units, which may include removal of existing equipment and installation of new digital static excitation systems.
This Sources Sought notice is issued solely for market research purposes to assess industry capability, interest, and potential acquisition strategies. It does not constitute a solicitation.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.