Skip to content
Department of Energy

Main Entrance Portal Replacement

Solicitation: JF476044
Notice ID: c18d028272a149a7abab411dcfce8e45
TypeSources SoughtNAICS 236220PSCY1AZSet-AsideNONEDepartmentDepartment of EnergyStateNYPostedMar 16, 2026, 12:00 AM UTCDueMar 27, 2026, 08:00 PM UTCCloses in 12 days

Sources Sought from ENERGY, DEPARTMENT OF • ENERGY, DEPARTMENT OF. Place of performance: NY. Response deadline: Mar 27, 2026. Industry: NAICS 236220 • PSC Y1AZ.

Market snapshot

Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.

12-month awarded value
$27,386,128,548
Sector total $34,988,013,130 • Share 78.3%
Live
Median
$1,628,947
P10–P90
$36,228$152,200,074
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
78.3%
share
Momentum (last 3 vs prior 3 buckets)
+9346%($26,812,363,741)
Deal sizing
$1,628,947 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for NY
Live POP
Place of performance
Upton, New York • 11973 United States
State: NY
Contracting office
Upton, NY • 11973 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NY20260002 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026New York • Albany, Columbia, Fulton +7
Rate
Asbestos/Insulator Worker SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems
Base $41.74Fringe $27.58
Rate
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems
Base $41.74Fringe $27.58
+91 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 91 more rate previews.
Davis-BaconBest fitstate match
NY20260002 (Rev 1)
Open WD
Published Jan 30, 2026New York • Albany, Columbia, Fulton +7
Rate
Asbestos/Insulator Worker SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems
Base $41.74Fringe $27.58
Rate
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems
Base $41.74Fringe $27.58
Rate
BOILERMAKER
Base $43.34Fringe $27.66
+90 more occupation rates in this WD
Davis-Baconstate match
NY20260008 (Rev 1)
Open WD
Published Jan 30, 2026New York • Cattaraugus, Chautauqua, Erie
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (include application of all materials, protective coverings, coatings, and finishings to all types of mechanical systems)
Base $37.65Fringe $30.69
Rate
HAZARDOUS MATERIAL HANDLER
Base $34.15Fringe $26.09
Rate
BOILERMAKER
Base $39.35Fringe $33.18
+77 more occupation rates in this WD
Davis-Baconstate match
NY20260004 (Rev 1)
Open WD
Published Jan 30, 2026New York • Broome, Chenango
Rate
coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement
Base $43.25Fringe $27.29
Rate
F WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system
Base $38.50Fringe $25.04
Rate
BOILERMAKER
Base $43.34Fringe $27.66
+56 more occupation rates in this WD
Davis-Baconstate match
NY20260049 (Rev 1)
Open WD
Published Jan 30, 2026New York • Orange
Rate
HANDLER (Duties limited to preparation, wetting, stripping, removal, scraping, vacuuming, bagging and disposing of all insulation materials whether they contain asbestos or not from mechanical systems)
Base $46.62Fringe $49.30
Rate
Insulator/asbestos worker (Includes application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $46.62Fringe $49.30
Rate
Bricklayer, Cement Mason, Plasterer
Base $43.04Fringe $34.99
+17 more occupation rates in this WD

Point of Contact

Name
Joseph Famiglietti
Email
jfamiglie@bnl.gov
Phone
Not available

Agency & Office

Department
ENERGY, DEPARTMENT OF
Agency
ENERGY, DEPARTMENT OF
Subagency
BROOKHAVEN NATL LAB -DOE CONTRACTOR
Office
Not available
Contracting Office Address
Upton, NY
11973 USA

More in NAICS 236220

Description

Notice of Interest: BSA is seeking interested contractors capable of performing the work describled below and interested in receiving the forthcoming solicitation. The formal solicitation will be issued at a later date and will also be posted on SAM.gov at that time. Note that security booths are being provided to the contractor as Government Furnished Equipment (GFE). 

Interested contractors are invited to submit a statement of interest along with a capabilities statement to BSA's Contract Specialist, Joseph Famiglietti, at jfamiglie@bnl.gov. Please include your Sam.gov Unique Entity Identifier (UEI).

Project Description:

Brookhaven National Laboratory (BNL) requires demolition and full replacement of the existing Main Gate Entrance (Building 680), originally constructed in 1960 and now beyond its useful service life. The new Entrance Portal will modernize site access, enhance security posture, improve operational efficiency, and support current and future Laboratory missions. The upgraded entrance will also complement the adjacent Science and User Support Center (SUSC), which serves as a publicly accessible facility.

The Contractor shall provide all labor, supervision, materials (except as noted below), equipment, and services necessary to demolish the existing entrance structures and construct the new Entrance Portal. Work includes but not limited to demolition, site preparation, foundations, structural construction, architectural construction, roadway modifications, utility installation and tie-ins, security infrastructure integration, sidewalks, paving, lighting, signage, striping, testing, casework, plumbing, mechanical, electrical, landscaping, and commissioning.

Government-Furnished Equipment (GFE): Brookhaven Science Associates (BSA) has separately procured two (2) security booths as long-lead items. The Contractor shall  coordinate delivery, relocate, install, anchor, and connect the Government-furnished booths. The Contractor shall not procure the security booths under this contract.

Work shall be phased to maintain continuous site security and controlled access to BNL during construction.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.