Department of Veterans Affairs

C1DZ--621-24-701 EHRM Infrastructure Upgrades Tier 3 Data Center Construction - Mountain Home VAMC

Solicitation: 36C77626B0006
Notice ID: b4b9ca634e314e61a7a0dbcddfc8a681
TypeSolicitationNAICS 236220PSCC1DZSet-AsideSDVOSBCDepartmentDepartment of Veterans AffairsStateTNPostedMar 12, 2026, 12:00 AM UTCDueMar 25, 2026, 06:00 PM UTCCloses in 13 days

Solicitation from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: TN. Response deadline: Mar 25, 2026. Industry: NAICS 236220 • PSC C1DZ.

Market snapshot

Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.

12-month awarded value
$27,385,908,335
Sector total $34,834,931,985 • Share 78.6%
Live
Median
$2,541,219
P10–P90
$45,480$165,000,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
78.6%
share
Momentum (last 3 vs prior 3 buckets)
+9346%($26,812,143,528)
Deal sizing
$2,541,219 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for TN
Live POP
Place of performance
Mountain Home, Tennessee • 37684 United States
State: TN
Contracting office
Independence, OH • 44131 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
TN20260162 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Tennessee • Hardin, Haywood
Rate
ELECTRICIAN
Base $27.25Fringe $15.72
Rate
POWER EQUIPMENT OPERATOR (Crane)
Base $36.25Fringe $13.40
+11 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 11 more rate previews.
Davis-BaconBest fitstate match
TN20260162 (Rev 1)
Open WD
Published Jan 23, 2026Tennessee • Hardin, Haywood
Rate
ELECTRICIAN
Base $27.25Fringe $15.72
Rate
POWER EQUIPMENT OPERATOR (Crane)
Base $36.25Fringe $13.40
Rate
POWER EQUIPMENT OPERATOR Backhoe/Trackhoe/Excavator
Base $33.23Fringe $13.40
+10 more occupation rates in this WD
Davis-Baconstate match
TN20260159 (Rev 1)
Open WD
Published Jan 23, 2026Tennessee • Gibson, Hardeman
Rate
ELECTRICIAN
Base $27.25Fringe $15.72
Rate
POWER EQUIPMENT OPERATOR (Crane)
Base $36.25Fringe $13.40
Rate
POWER EQUIPMENT OPERATOR Backhoe/Trackhoe/Excavator
Base $33.23Fringe $13.40
+10 more occupation rates in this WD
Davis-Baconstate match
TN20260138 (Rev 1)
Open WD
Published Jan 23, 2026Tennessee • Tipton
Rate
ELECTRICIAN
Base $36.75Fringe $16.19
Rate
Operating Engineers: Bulldozer, Crane, and Forklift
Base $33.15Fringe $13.62
Rate
LABORER: Common or General
Base $18.47Fringe $6.65
+5 more occupation rates in this WD
Davis-Baconstate match
TN20260130 (Rev 1)
Open WD
Published Jan 23, 2026Tennessee • Madison
Rate
ELECTRICIAN
Base $36.75Fringe $16.19
Rate
Operating Engineers: Bulldozer, Crane, and Forklift
Base $33.15Fringe $13.62
Rate
LABORER: Common or General
Base $18.47Fringe $6.65
+5 more occupation rates in this WD

Point of Contact

Name
Amanda Webster
Email
Amanda.Webster@va.gov
Phone
216-447-8301
Name
Bridget May
Email
bridget.may@va.gov
Phone
Not available

Agency & Office

Department
VETERANS AFFAIRS, DEPARTMENT OF
Agency
VETERANS AFFAIRS, DEPARTMENT OF
Subagency
PCAC (36C776)
Office
Not available
Contracting Office Address
Independence, OH
44131 USA

More in NAICS 236220

Description

The Mountain Home VAMC is seeking a general contractor to coordinate all design efforts to relocate the main computer room (MCR) on Floor 3 of Building 77 located at James H. Quillen VA Medical Center (JHQVAMC) and make it compliant with VA standards for a Tier 3 data center. The area of work for this project will occur within rooms 3A109 (existing MCR), 3A112, 3A112A, 3A112D, 3A113, 3A113A, and 3A212. Work will include providing redundant power distribution, computer room cooling and distribution, replacement of aged equipment, grounding and bonding, cable management, and new fiber and copper to the new MCR. A new clean-agent system will be provided, as well as a new fire rated assembly within the new MCR, ensuring that all penetrations are sealed appropriately. A new space will be provided in room 3A112A to host cylinder storage for the clean agent system.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.