- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Bldg 318 & 1250 Gutter, Drain, and Basin Repair, Removal, and Install
Combined Synopsis Solicitation from DEPT OF THE AIR FORCE • DEPT OF DEFENSE. Place of performance: AR. Response deadline: Apr 09, 2026. Industry: NAICS 332311 • PSC 5670.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 332311 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 34 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 332311
Description
ATTENTION: Questions and Answers have been posted see below:
Attachment: Questions - Gutters
--------------------------------------------------------------------------------------------------
The contractor shall provide all qualified personnel, transportation, tools, equipment, materials and services required to repair roof gutter, drains and concrete basins to allow proper water drainage away from buildings 1250 and 318 at Little Rock Air Force Base Arkansas, 72099. All work will be conducted in a satisfactory manner to allow proper water drainage from roofs without damaging plants (except as noted in attached pictures) nor causing erosion due to runoff. The contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS). Work shall follow all Federal, State and local regulations, codes and license requirements.
Attachments
Combo - FA446025Q0006
PWS - REPAIR ROOF GUTTERS AND DRAINS
SCA - Wage Determination
Addendum - 52.212-1, Instructions to Offeror
Addendum - 52.212-2, Evaluation
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.