TSS Ductless System at EWR ATCT
Solicitation from FEDERAL AVIATION ADMINISTRATION • TRANSPORTATION, DEPARTMENT OF. Place of performance: NJ. Response deadline: Apr 15, 2026. Industry: NAICS 238220 • PSC Z1BA.
Market snapshot
Awarded-market signal for NAICS 238220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 61 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 238220
Description
Mechanical
· Install (3) indoor wall-mounted units, along with all refrigerant and drain piping.
· Install (1) 6-ton heat pump. Unit to be anchored to exterior concrete wall via on L-bracket steel frame.
· Coordinate core penetrations through concrete wall for piping, electrical, and drain lines. Installation to
include all wall waterproofing.
· Provide and insulate all refrigerants and condensate piping above ceiling
· Test and charge system to verify operation.
Electrical
· Install new dedicated 208V, 3-phase power circuit
· Provide NEMA 4X, 60A non-fused stainless steel disconnect at outdoor unit
· Provide power and control conduit and wiring to/from all units
· Penetrate concrete wall.
· Provide penetration and conduit through roof deck. Patch and flash roof as required to maintain new roof
warranty through Carlisle Roof installer.
Controls
· Integrate mini-split system into the existing FAA Schneider Electric EcoStruxure DDC system via BACnet
· Provide and install one IP-IO module at VAV-17 for coordinated backup cooling enable/disable
· Submit point list, graphics, and control narrative to COR for approval.
· Program unit set points, and update AHU-3 supply air setpoints
· Support commissioning of system to validate operation.
Structural & Interior
· Concrete core penetration for pipes and conduits
· Provide support framing for all units and steel plates as shown in drawing.
· Provide support for pipes and conduits.
· Work to include wall restoration and painting.
Site Visit - A site visit is scheduled for 03/17/26 at 3:00pm EST. If necessary, a secondary site visit will take place at 5:00pm EST. If interested in attending, notify the CO at elisha.distler@faa.gov NLT 03/11/26 at 5:00pm CST. Please provide the names of all attendees and limit the total personnel to three individuals per firm.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.