Skip to content
Davis-Bacon

NJ20260027 (Rev 1)

Coverage: New Jersey • Burlington.

Published: Jan 30, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
gs and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement)$60.84$48.38
s and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))$55.80$40.80
Bricklayer$45.20$33.26
Marble setter$64.66$40.97
TERRAZZO WORKER/SETTER$61.77$42.82
Tile finisher$43.63$32.12
Tile setter$52.31$38.01
CARPENTER (Scaffold Builder)$57.42$59.25
CARPENTER Including Acoustical Ceiling Installation, Drywall Hanging, Formwork, Batt and Blown Insulation$57.42$59.25
Soft floor layer$57.42$59.25
PILEDRIVERMAN$46.73$41.69
Millwright$58.84$59.25
Electrician and cable splicer (Includes Low Voltage Wiring)$63.82$65.80
Electrician and cable splicer$55.05$77.77
Elevator mechanic$71.85$38.43
Power equipment operators: GROUP 1$61.72$37.50
GROUP 2$60.13$37.50
GROUP 3$58.22$37.50
GROUP 4$56.59$37.50
GROUP 5$52.88$37.50
IRONWORKER Reinforcing$53.24$38.40
Structural and Ornamental$54.24$38.40
Asbestos Removal Laborer$28.37$21.62
LABORER MASON TENDER: Brick/Cement/Concrete$36.50$30.22
Laborers: Asphalt Shoveler, Asphalt Spreader, Landscape Laborer, Pipelayer, Power Toole Operator and Screedman$35.75$30.22
Glazier$49.96$35.11
DRYWALL FINISHER/TAPER$44.87$30.15
PAINTER (Brush & Roller)$45.55$29.86
PAINTER (Spray)$45.55$29.86
CEMENT MASON/CONCRETE FINISHER$53.21$33.42
PIPEFITTER (Including HVAC Pipe Installation)$59.57$46.45
Service and Repair$46.23$29.23
PLUMBER (Excluding HVAC Pipe Installation)$59.57$46.45
PIPEFITTER (Including HVAC Pipe Installation)$56.30$50.76
PLUMBER (Excluding HVAC Pipe Installation)$56.30$50.76
Roofer SHINGLES$35.95$21.85
SLATE AND TILE$38.95$21.85
ALL OTHER WORK$46.03$34.27
SPRINKLER FITTER (Fire Sprinklers)$59.19$36.51
Sprinkler fitter (Fire Sprinklers)$60.83$30.34
SHEET METAL WORKER (Including HVAC Duct Installation)$59.08$47.06
Truck drivers: Dump Truck$48.63$42.65
Off the Road Truck$48.78$42.65
Truck drivers: Dump Truck Drivers$44.30$34.11
Off the Road Truck$44.65$34.11
LABORER: Common or General$19.27$12.42
PLASTERER$42.33$0.00

Related Wage Determinations

View directory →