- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
Presolicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: Colorado, Nebraska, and Wyoming • 82001. Response deadline: Apr 30, 2026. Industry: NAICS 237130 • PSC Y1NZ.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 237130 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS 237130
Description
Update 0002 (28 March 2026): The solicitation date is tentatively schedule for the week of 13 April 2026. A draft of the Phase Two solicitation requirements, evaluation criteria and Seed Project will be included to provide interested offerors a representative sample of task orders to be solicited under this contract. Update 0001 (6 March 2026): This acquisition has been updated to include Design-Bid-Build (DBB) as shown within the title. Reference the attached pre-solicitation notice and associated documents. Previously related notices were 1) W9128F25SM032 - Sources Sought Announcement of Ground Based Strategic Deterrent Utility Corridor, Francis E. Warren Air Force Base, Wyoming and 2) Industry Day - Ground Based Strategic Deterrent Utility Corridor, Francis E. Warren Air Force Base, Wyoming for reference.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.