Skip to content
Department of Agriculture

Rock Creek Road Maintenance

Solicitation: 127EAX26Q0014
Notice ID: ab713ee42b444003a9d5876b694a874d
TypeCombined Synopsis SolicitationNAICS 237310PSCZ1LBSet-AsideSBADepartmentDepartment of AgricultureAgencyForest ServiceStateNMPostedMar 12, 2026, 12:00 AM UTCDueApr 10, 2026, 06:00 PM UTCCloses in 29 days

Combined Synopsis Solicitation from FOREST SERVICE • AGRICULTURE, DEPARTMENT OF. Place of performance: NM. Response deadline: Apr 10, 2026. Industry: NAICS 237310 • PSC Z1LB.

Market snapshot

Awarded-market signal for NAICS 237310 (last 12 months), benchmarked to sector 23.

12-month awarded value
$677,989,178
Sector total $34,834,884,440 • Share 1.9%
Live
Median
$1,558,571
P10–P90
$83,610$4,499,844
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
1.9%
share
Momentum (last 3 vs prior 3 buckets)
+3456%($640,901,430)
Deal sizing
$1,558,571 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for NM
Live POP
Place of performance
Tres Piedras, New Mexico • 87577 United States
State: NM
Contracting office
Albuquerque, NM • 871023498 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NM20260031 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026New Mexico • Cibola, Guadalupe, Harding +3
Rate
Carpenter Drywall Hanging Only
Base $24.08Fringe $10.79
Rate
CARPENTER Drywall Hanging Only
Base $29.09Fringe $16.20
+40 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 40 more rate previews.
Davis-BaconBest fitstate match
NM20260031 (Rev 1)
Open WD
Published Jan 30, 2026New Mexico • Cibola, Guadalupe, Harding +3
Rate
Carpenter Drywall Hanging Only
Base $24.08Fringe $10.79
Rate
CARPENTER Drywall Hanging Only
Base $29.09Fringe $16.20
Rate
ELECTRICIAN Zone 1
Base $40.30Fringe $13.41
+39 more occupation rates in this WD
Davis-Baconstate match
NM20260030 (Rev 1)
Open WD
Published Jan 30, 2026New Mexico • Union
Rate
CARPENTER Drywall Hanging Only
Base $24.08Fringe $10.79
Rate
ELECTRICIAN Zone 1
Base $40.30Fringe $13.41
Rate
Power Equipment Operator (2) Roller(Dirt and Grade Compaction)
Base $26.75Fringe $4.65
+38 more occupation rates in this WD
Davis-Baconstate match
NM20260015 (Rev 1)
Open WD
Published Jan 30, 2026New Mexico • Colfax
Rate
CARPENTER Drywall Hanging Only
Base $24.08Fringe $10.79
Rate
Power Equipment Operator (2) Roller(Dirt and Grade Compaction)
Base $26.75Fringe $4.65
Rate
Bobcat/Skid Loader
Base $27.70Fringe $4.65
+38 more occupation rates in this WD
Davis-Baconstate match
NM20260028 (Rev 1)
Open WD
Published Jan 30, 2026New Mexico • San Miguel
Rate
CARPENTER Drywall Hanging and Drywall Finishing/Taping Only
Base $24.08Fringe $10.79
Rate
ELECTRICIAN Zone 1
Base $40.30Fringe $13.41
Rate
Power Equipment Operator (2) Roller(Dirt and Grade Compaction)
Base $26.75Fringe $4.65
+38 more occupation rates in this WD

Point of Contact

Name
Troy A. McCullough
Email
troy.mccullough@usda.gov
Phone
Not available

Agency & Office

Department
AGRICULTURE, DEPARTMENT OF
Agency
FOREST SERVICE
Subagency
USDA-FS, CSA SOUTHWEST 7
Office
Not available
Contracting Office Address
Albuquerque, NM
871023498 USA

More in NAICS 237310

Description

Amendment 0001 - 3/12/2026

The Purpose of Amendment 0001 is to:
1. Correct the quote due date discrepancy. Quote Due Date is April 10th, 2026 at 1:00 pm Central Daylight Time.
2. Remove Scheduled Site visit date. Due to current weather conditions at project location, there will not be a scheduled site visit. Contractors can visit the location on their own.

The Carson National Forest is pursuing road maintenance activities to be accomplished on the Tres Piedras Ranger
District.  Base items include drain dip construction, road widening, curve widening, road obliteration, new construction, rip rap placement, road reconditioning, and culvert installation. Drain dip construction will involve excavation and compaction of approximately 180 cubic yards of native material. Road widening will involve approximately 1390 cubic yards of excavation and compaction and will result in total road widths of twelve (12) feet.  New construction will involve 0.6 miles of clearing and grubbing and approximately 600 cubic yards of excavation and compaction. Road reconditioning will involve ditch maintenance, shoulder maintenance, roadbed maintenance, and aggregate surface maintenance where applicable. Lastly, culvert installation will involve the placement of a 57” x 38” arched corrugated metal pipe thirty (30) feet in length on top of approximately 30 cubic feet of uncompacted bedding material.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.