Sandbridge Beach Renourishment Project

Solicitation: W9123626Z1AW4ID
Notice ID: a497e4fc86c849ae99d8d82c7379313a
TypeSpecial NoticeNAICS 237990PSCY1KFSet-AsideNONEDepartmentDepartment of DefenseAgencyDept Of The ArmyStateVAPostedFeb 13, 2026, 12:00 AM UTCDueFeb 28, 2026, 04:59 AM UTCCloses in 5 days

Special Notice from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: VA. Response deadline: Feb 28, 2026. Industry: NAICS 237990 • PSC Y1KF.

Market snapshot

Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$1,287,533,718
Sector total $33,071,130,462 • Share 3.9%
Live
Median
$551,853
P10–P90
$43,045$119,860,900
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
3.9%
share
Momentum (last 3 vs prior 3 buckets)
+48369%($1,282,231,886)
Deal sizing
$551,853 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →

Description

02/13/2026 UPDATE: FINAL Slides (Project Information), Industry Day Attendance Report, and Q&A Session

01/08/2026 UPDATE: Draft Plans, Specs, and Drawings for Industry Day Discussion have been added to this Notice.

The U.S. Army Corps of Engineers (USACE), Norfolk District (NAO) is hosting a VIRTUAL Industry Day event on Thursday 29 January 2026, from 9:30 a.m. to 11:30 a.m. (EST) for dredging industry contractors interested in the future Sandbridge Beach Renourishment contract. Pre-registration is required for this VIRTUAL event. To RSVP, please provide your name, company, relation to the dredging industry, and email address by email to Contract Specialist, Susan Ellis at susan.k.ellis@usace.army.mil by close of business on 26 January 2026. A virtual calendar invite will be sent to registered participants prior to the event. There is no solicitation at this time. The event is neither a marketing opportunity for businesses, nor will it promote upcoming projects.

Project Description:

The U.S. Army Corps of Engineers (USACE), Norfolk District has a dredging and beach restoration requirement for the Sandbridge Beach erosion and Control and Hurricane Protection project, located in Hampton Roads, Virginia. New dredging work by hopper dredge is anticipated for the Sandbridge shoal borrow site A, the southern borrow site, and placement at Sandbridge Beach for beach renourishment activities. Dredging volume is approximately 6.65 miles from the North end of the Sandbridge Beach renourishment area, and 4.6 miles from the middle, and 4.5 miles from the South end. Sandbridge shoal borrow site A has depths ranging from -35 feet mean lower low water (MLLW) to -67 feet MLLW. The scope will require the contract to perform before-dredge and after-dredge hydrographic surveys of the 3,261 acres Sandbridge borrow site A.

USACE, Norfolk District is anticipating soliciting a stand-alone (C-type) firm fixed price construction contract to interested firms with the ability to perform Hopper Dredging. DFARS 236.204(ii) Disclosure of the magnitude is between $25,000,000 and $100,000,000. NAICS code 237990 Other Heavy and Civil Engineering Construction has a small business size standard of $37M. The construction period will be approximately 276 days from issuance of the Notice-To-Proceed. There is a time restriction from September 01 through November 14 when hopper dredging is prohibited.

The purpose of the event is to seek dredging industry input regarding best practices, alternative suggestions, and examples of past success on similar projects for the technical execution of the Sandbridge Beach Renourishment contract. The event will begin with the USACE-NAO’s presentation of the project’s scope, dredge areas, pumping distances, and dredged material placement considerations. At the conclusion of the presentation, there will be project discussion and question-and-answer period.  USACE-NAO encourages participants to input suggestions to be considered for the final design and solicitation.

Draft Drawings and Specifications for the Sandbridge Beach Renourishment project will be provided as an attachment to this Notice prior to the scheduled Industry Day event for the purpose of receiving industry feedback. Please submit questions and suggestions for Discussion to Contract Specialist, Susan Ellis at susan.k.ellis@usace.army.mil. The draft documents are for information purposes only and shall NOT be construed as the Solicitation. Draft documents are expected to be revised prior to the issuance of the Solicitation.

The Solicitation for the Sandbridge Beach Renourishment project is expected to be in the Summer of 2026. This announcement is not a contract solicitation, request for proposal, promise to issue any future contract, forum to discuss upcoming work, nor commitment to offer work of any kind on the part of the Government. The Government will not assume liability for any costs and travel expenses incurred by an attendee for this event.

POC: Susan Ellis, Contract Specialist, Norfolk District; susan.k.ellis@usace.army.mil

Alternate POC: Nikki Kirtsey, Contracting Officer, Norfolk District, tiffany.n.kirtsey@usace.army.mil

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 15, 2026
Executive summary

The Sandbridge Beach Renourishment Project, managed by the U.S. Army Corps of Engineers (USACE), Norfolk District, involves dredging and beach restoration efforts in Hampton Roads, Virginia. The project anticipates a dredging volume determined by the specifics of the Sandbridge shoal borrow site, with a contract value estimated between $25 million and $100 million. An Industry Day is scheduled for January 29, 2026, to discuss the project scope and gather input for the upcoming solicitation expected in Summer 2026.

What the buyer is trying to do

The buyer aims to engage dredging industry contractors for input on best practices and potential improvements to the technical execution of the Sandbridge Beach Renourishment contract, which will require significant dredging operations and hydrographic surveys.

Work breakdown
  • Participate in Industry Day on January 29, 2026.
  • Review draft plans and specifications provided by USACE.
  • Submit suggestions and questions to the Contract Specialist.
  • Prepare for future solicitation expected in Summer 2026.
Response package checklist
  • RSVP for Industry Day by January 26, 2026.
  • Review and analyze draft plans and specs prior to the Industry Day.
  • Prepare input and questions for the discussion period.
Suggested keywords
DredgingBeach restorationHydrographic surveysRenourishmentConstruction contract
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on specific dredging methods to be utilized are not provided.
  • Exact timeline for Notice-To-Proceed is unclear.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.