John Day Fish Pump Rehabilitation
Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: OR. Response deadline: May 13, 2026. Industry: NAICS 237990 • PSC Z2KA.
- Source
- Open on SAM.gov →
- Solicitation
- W9127N26BA001
- Performance
- Rufus, Oregon • United States
- Response
- May 13, 2026, 08:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 32 more rate previews.↓
More in NAICS 237990
Description
W9127N26BA001 Amendment 0001 posted 9 April 2026
---------------------------------------------------
The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.
Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3.
Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.
The following information represents the project objectives:
- Removal and replacement of damaged pump shafts and bearings.
- Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
- Precision machining (true-up) of shafts, bearing housings, and diffuser components.
- Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
- On-site reassembly, shaft alignment, gearbox installation, and system balancing.
- Testing of the completed pump unit(s) to verify functional performance.
- Delivery of updated operation and maintenance manuals, drawings, and spare parts.
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Other matched support routes↓
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.