Skip to content
Department of Agriculture

Meeks Mesa Campground Construction

Solicitation: 1240LT26Q0033
Notice ID: 852afb209e7848bdad0219fb44fb1b0c
TypeCombined Synopsis SolicitationNAICS 237990PSCY1PZSet-AsideSBADepartmentDepartment of AgricultureAgencyForest ServiceStateUTPostedMar 23, 2026, 12:00 AM UTCDueApr 27, 2026, 09:00 PM UTCCloses in 17 days

Combined Synopsis Solicitation from FOREST SERVICE • AGRICULTURE, DEPARTMENT OF. Place of performance: UT. Response deadline: Apr 27, 2026. Industry: NAICS 237990 • PSC Y1PZ.

Market snapshot

Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$1,715,365,878
Sector total $37,340,646,106 • Share 4.6%
Live
Median
$2,373,471
P10–P90
$1,104,085$15,131,775
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
4.6%
share
Momentum (last 3 vs prior 3 buckets)
+116%($629,345,191)
Deal sizing
$2,373,471 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for UT
Live POP
Place of performance
Utah • United States
State: UT
Contracting office
Richfield, UT • 84701 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
UT20260098 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Utah • Sanpete
Rate
CARPENTER, Includes Form Work
Base $22.34Fringe $3.48
Rate
CEMENT MASON/CONCRETE FINISHER
Base $21.21Fringe $2.87
+27 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 27 more rate previews.
Davis-BaconBest fitstate match
UT20260098 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Sanpete
Rate
CARPENTER, Includes Form Work
Base $22.34Fringe $3.48
Rate
CEMENT MASON/CONCRETE FINISHER
Base $21.21Fringe $2.87
Rate
ELECTRICIAN
Base $26.83Fringe $0.00
+26 more occupation rates in this WD
Davis-Baconstate match
UT20260086 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Tooele
Rate
CARPENTER (Drywall Hanging and Metal Stud Installation Only)
Base $31.66Fringe $13.97
Rate
ELEVATOR MECHANIC
Base $55.43Fringe $38.43
Rate
DRYWALL FINISHER/TAPER
Base $26.00Fringe $8.78
+23 more occupation rates in this WD
Davis-Baconstate match
UT20260017 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Beaver, Emery, Grand +3
Rate
OPERATOR: Power Equipment (3)Backhoe/Excavator
Base $30.78Fringe $16.09
Rate
OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Crane, Mechanic, Trencher
Base $35.68Fringe $17.57
Rate
Oiler
Base $22.03Fringe $11.88
+21 more occupation rates in this WD
Davis-Baconstate match
UT20260074 (Rev 0)
Open WD
Published Jan 02, 2026Utah • Piute
Rate
BOILERMAKER
Base $44.37Fringe $26.87
Rate
SPRINKLER FITTER (Fire Sprinklers)
Base $42.17Fringe $26.63
Rate
SHEET METAL WORKER (HVAC Duct Installation Only)
Base $46.79Fringe $14.89
+15 more occupation rates in this WD

Point of Contact

Name
Derrick A Dodson
Email
derrick.dodson@usda.gov
Phone
Not available
Name
Matt W Vellinga
Email
matt.vellinga@usda.gov
Phone
Not available

Agency & Office

Department
AGRICULTURE, DEPARTMENT OF
Agency
FOREST SERVICE
Subagency
Fishlake National Forest
Office
Not available
Contracting Office Address
Richfield, UT
84701 USA

More in NAICS 237990

Description

  1. This project includes the construction of the Meeks Mesa Campground and Trailhead.
    1. The base bid work includes:
      1. Removal and disposal of existing vegetation that is affected by new construction.
      2. Constructing new asphalt roads and spurs with line striping and crosswalk hatch.
      3. Widening state route 24 to include pavement, lane striping and culvert extensions.
      4. Constructing new concrete group site, concrete family units, aggregate family units, tent pads and installing new campground site furniture.
      5. Installing new family unit shelters and group site shelter.
      6. Installing new single and double precast concrete vault restrooms.
      7. Installing directional and regulatory signs, road closure gates, dumpster pad with enclosure wall, unit markers, bulletin board with fee tube, barrier rocks, concrete and aggregate surface paths.
      8. Constructing rockery retaining walls.
      9. Constructing drainage swales.
      10. Constructing post and pole fencing.
      11. Constructing a major site I.D. sign with stone base and minor site I.D. sign.
    2. Bid Options work includes:
      1. Constructing native surface trails.
      2. Constructing berm and boulder cluster pods.
      3. Coloring asphalt with mix additive.
    3. Quantities associated with these options are identified in the Schedule of Items.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.