Skip to content
Department of Defense

3389 LCHD-ESS Special Notice - Draft Specification

Solicitation: Not available
Notice ID: 832b2ac4ec314ce68e3bfb5a212adf71
TypeSpecial NoticeNAICS 336611PSC1955DepartmentDepartment of DefenseAgencyDept Of The ArmyPostedDec 31, 2025, 12:00 AM UTCDueDec 31, 2025, 10:00 PM UTCExpired

Special Notice from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: United States. Response deadline: Dec 31, 2025. Industry: NAICS 336611 • PSC 1955.

DoD CMMC Readiness
Modern compliance support by Federal Bid Partners

CMMC support options for this DoD solicitation

As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.

Done-for-you service
CMMC start-to-finish with FBP
$2,000
Registered Practitioner logo
Guided by a Registered Practitioner with practical DoD workflow support.
  • Gap review, remediation roadmap, and implementation support
  • Policy package, evidence mapping, and submission prep
  • Designed for primes and subs across non-tech and tech work
Start CMMC with Federal Bid Partners →
AI-powered application
CMMC Pulsar™ start-to-finish
$399
CMMC Pulsar logo
First-of-its-kind CMMC Pulsar™ app to run your CMMC workflow with AI assistance.
  • Structured checklist, AI guidance, and progress tracking
  • Build evidence and controls with clearer next-step workflows
  • Ideal for teams that want speed plus affordability
Open CMMC Pulsar™ →
Requirements vary by acquisition and contract type; COTS-only exceptions may apply.

Market snapshot

Awarded-market signal for NAICS 336611 (last 12 months), benchmarked to sector 33.

12-month awarded value
$10,593,880,397
Sector total $20,521,335,901 • Share 51.6%
Live
Median
$855,039
P10–P90
$45,999$21,186,181
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
51.6%
share
Momentum (last 3 vs prior 3 buckets)
+100%($10,593,880,397)
Deal sizing
$855,039 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Live POP
Place of performance
United States
Contracting office
Philadelphia, PA • 19103-0000 USA

Point of Contact

Name
Michael Hunter
Email
Michael.J.Hunter@usace.army.mil
Phone
Not available
Name
Domenic Sestito
Email
Domenic.L.Sestito@usace.army.mil
Phone
Not available

Agency & Office

Department
DEPT OF DEFENSE
Agency
DEPT OF THE ARMY
Subagency
US ARMY CORPS OF ENGINEERS
Office
ENGINEER DIVISION NORTH ATLANTIC • ENDIST PHILADELPHIA • W2SD ENDIST PHILADELPHIA
Contracting Office Address
Philadelphia, PA
19103-0000 USA

More in NAICS 336611

Description

Throughout this draft specification, there are areas in which the USACE is trying to fully understand the ramifications of various requirements from a design and construction standpoint. In reviewing the draft specifications, please provide meaningful feedback regarding the risk, concerns, and/or conflicts with the following requirements throughout the specification:

  1. C004, C180, C201, C415, C427: ABS HAB(WB) Notation and Additional Requirements – The vessel will receive an ABS HAB(WB) notation; however, throughout the specification, there are additional requirements that the contractor shall adhere to deriving from the HAB+(WB) and HAB++(WB) requirements.
  2. C002, C121, C180: 7 knot current with 2 knot speed over ground
  3. C002, C121, C605, C606: 14 knot transit speed with hopper empty
  4. C165: Ship Motion accelerations are still being determined by field measurements on board the current dredge ESSAYONS. Any suggestions or concerns in mitigating ship motion accelerations within the design approach within the area of operation of this vessel?
  5. C002, C201: Berthing Requirements – The USACE operates above the minimum manning requirements for a vessel. How would increased berthing requirements affect the design and construction of the vessel?
  6. Business Related Concerns to insight competition (i.e. stipend, bonding, Economic Price Adjustment, Period of Performance, etc.)?
  7. Are there any technical requirements that impacts the ability to utilize traditional hopper dredge design and construction?

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.