- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Child Development Center at Ft. Jackson, SC
Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: SC. Response deadline: Apr 23, 2026. Industry: NAICS 236220 • PSC Y1JZ.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 20 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 236220
Description
**NOTE: This pre-solicitation and sources sought posted as W912HP26RA013-- Due to technical issues with ACWS a new solicitation number was pulled.CDC Ft. Jackson: The United States Army Corps of Engineers (USACE) Charleston District (SAC) has a new requirement for construction of a Child Development Center. The Child development Center facility includes developmental learning modules, activity areas, an isolation room, changing areas, patron visitor waiting area, administrative support space, staff lounge workroom, commercial kitchen, laundry, storage, supply rooms, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, Closed Circuit Television (CCTV) installation, and Energy Monitoring Control Systems (EMCS) connection. Additionally, the facility includes outdoor play areas with age-appropriate child development equipment, safety surfacing, and fencing. Sustainability and energy enhancement measures are included. In total, the project includes the 37,300 square foot Child Development Center building, and 38,311 square feet of the playground area. Amendment 0001- Add utilities
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.